Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Chennai EMU - என்னோட உயிர் டா நீ

Full Site Search
  Full Site Search  
 
Sat Sep 19 22:05:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search

JHP/Jujharpur
     जुझारपुर

Track: Double Electric-Line

Show ALL Trains
Unnamed Rd, Itarsi
State: Madhya Pradesh


Zone: WCR/West Central   Division: Bhopal

No Recent News for JHP/Jujharpur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: n/a
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station News

Page#    Showing 1 to 2 of 2 News Items  
Mar 31 2019 (16:36) New Bypass at Itarsi Set to Speed up Trains, Save Time on the North-South Route (www.railpost.in)
IR Affairs
WCR/West Central
0 Followers
13916 views

News Entry# 379823  Blog Entry# 4277554   
  Past Edits
Mar 31 2019 (16:36)
Station Tag: Jujharpur/JHP added by 12649⭐️ KSK ⭐️12650^~/1203948

Mar 31 2019 (16:36)
Station Tag: Powarkheda/PRKD added by 12649⭐️ KSK ⭐️12650^~/1203948

Mar 31 2019 (16:36)
Station Tag: Itarsi Junction/ET added by 12649⭐️ KSK ⭐️12650^~/1203948
A long-awaited measure to speed up trains and reduce congestion at Itarsi (ET) station on West Central Railway is now moving forward. Construction of the Itarsi station bypass, sanctioned over a decade ago, is finally well underway.
When complete, the bypass will save anywhere between 15-20 minutes for trains on the North-South route, sources in West Central Railway claim.
The bypass will start from just outside Jujharpur station to the south of ET on the Nagpur (NGP) – Itarsi line. It will head north from there. A flyover will take the bypass line
...
more...
over the Bhusawal – Itarsi line, after which it will go around Itarsi town, thus completely avoiding ET station and yard. The alignment will then turn east and meet the existing line just south of Powerkheda station.
For trains in the Up (Bhopal to Nagpur) direction, single line flyovers are planned to avoid detention at the entry and exit of the bypass. Work on these flyovers is yet to begin. Trains in the Down (Nagpur to Bhopal) direction will not need flyovers to switch to the bypass.
The Itarsi bypass will save time by avoiding routine detention at Itarsi station entry and within the station yard. Itarsi station is at the intersection of two important trunk lines – one heading from Mumbai to Jabalpur / Allahabad, and the other heading from Chennai to Delhi. As a result, the station witnesses many crisscrossing train movements every day.
With the bypass, trains like Durontos, Rajdhanis and Sampark Krantis on the North-South that normally skip Itarsi will be able to avoid the yard and the station, thus saving a significant amount of time in their schedules. Congestion at Itarsi station will also be reduced as a result.
With Powerkheda also being turned into a freight terminal, sources say it is also likely that the goods loading at Itarsi will be moved to the new terminal, thus freeing up the yard from freight-related movement.
Originally sanctioned in the Railway Budget of 2008-09 as a North-South Grade Separator for Itarsi at a cost of Rs. 80 crores, the cost of the bypass has since escalated significantly. Issues with land acquisition and changes in the scope of work have also contributed to the delay of a decade, according to sources. Construction work on the much needed bypass only began in 2018.
A significant amount of work still remains, and sources say that it may be another two years before the entire project is complete.
More such bypasses and flyovers have been sanctioned at other key junctions to overcome issues of congestion in slow yards. The benefits of these will only become clear over the course of the next few years.

5 Public Posts - Sun Mar 31, 2019





Nov 29 2018 (11:45) जीएम के आने से पहले गुणवत्ता और तेजी के साथ पूरा करें काम : डीआरएम (www.bhaskar.com)
IR Affairs
CR/Central
0 Followers
15845 views

News Entry# 370253  Blog Entry# 4052031   
  Past Edits
Nov 29 2018 (11:45)
Station Tag: Jujharpur/JHP added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Saheli/SAHL added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Dharakhoh/DHQ added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Maramjhiri/MJY added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Dhodramohar/DOH added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Kiratgarh/KRTH added by 12649⭐️ KSK ⭐️12650^~/1203948

Nov 29 2018 (11:45)
Station Tag: Betul/BZU added by 12649⭐️ KSK ⭐️12650^~/1203948
बैतूल| मध्य रेल नागपुर मंडल के डीआरएम एमएस उप्पल ने मंगलवार को बैतूल से कीरतगढ़ तक के स्टेशन का निरीक्षण किया। डीआरएम सुबह 8.30 बजे तीन कोच की स्पेशल ट्रेन से बैतूल पहुंचे। उन्होंने करीब 30 मिनट तक कोसमी गेट का निरीक्षण किया। इसके बाद वह मरामझिरी पहुंचे। मरामझिरी में सोमवार को पटरी टूटने से मालगाड़ी के तीन इंजन बेपटरी होने के घटना स्थल का निरीक्षण किया। घटना स्थल पर इंजन, टूटी पटरी व हादसे से रेलवे को हुए नुकसान की जानकारी ली। घटना स्थल पर जल्द से जल्द सुधार कार्य कर करने के निर्देश दिए। इसके बाद डीआरएम ढोढरामोहर रेलवे स्टेशन पहुंचे। जहां उन्होंने रेलवे स्टेशन, रेलवे कॉलोनी, टीआरडी विभाग के कार्यालय का निरीक्षण कर कीरतगढ़ के लिए रवाना हुई। 20 मिनट तक कीरतगढ़ स्टेशन का निरीक्षण करने के बाद जुझारपुर स्टेशन पहुंचे। वहां से वापस सहेली स्टेशन के पास ब्रिज पर ट्रेन रुक ब्रिज का निरीक्षण किया। ...
more...
Page#    Showing 1 to 2 of 2 News Items  

Go to Full Mobile site