Timeline of all Site Edits
CAR/Chunar Junction (5 PFs); Stop REMOVED
ARA/Ara Junction (3 PFs); Stop REMOVED
ARA/Ara Junction (3); Passes Thru; Arrival: 05:35; Departure: 05:35
DNR/Danapur (5 PFs); Stop REMOVED
DNR/Danapur (5); Passes Thru; Arrival: 06:15; Departure: 06:15
LHB Rake; LOCO-HCPV-EOG-A1-A2-A3-A4-A5-H1-PC-B1-B2-B3-B4-B5-B6-B7-B8-B9-B10-B11-B12-EOG
Rake Notes:
LHB Rake; L HCPV -EOG-A1 -A2- A3- A4 H1 PC - B1 -B2-B3-B4-B5-B6-B7-B8-B9-B10-B11 B12 EOG
Rake Notes:
ICF Rake; LOCO-SLR-GS-GS-GS-GS-GS-GS-GS-GS-GS-GS-GS-GS-C1-GS-GS-GS-GS-GS-GS-GS-GS-SLR
ICF Rake; Loco-slrd-D1-D2-D3-D4-D5-D6-D7-D8-D9-D10-D11-C1-gs-gs-gs-gs-gs-gs-gs-gs-gs-slrd