Timeline of all Site Edits
WL/Confirmed/Fixit WaitList Only Confirmed Only Fixit Only --- RAC Only Void Only
Attach: ED/WAP-7 ED/Erode Junction->JTJ/Jolarpettai Junction
Attach: ED/WAP-4 ED/Erode Junction->JTJ/Jolarpettai Junction
Attach: ED/WAP-7 JTJ/Jolarpettai Junction->ED/Erode Junction
Attach: ED/WAP-4 JTJ/Jolarpettai Junction->ED/Erode Junction
▪️One rake has CC as; SLR-GS-GS-GS-GS-C1-D3-D2-D1-GS-GS-GS-SLR ▪️Front SLR (Coach No.1) is LADIES coach. ▪️Number of General coaches may get reduced in some runs.▪️ Departure from Balurghat is cancelled on 18.12.19 & Will Run as Passanger Special Till Kolkata From Maldah Town With Same Route & Stoppage on 18.12.19. Past Edits News Entry# 0 ▪️One rake has CC as: SLR-GS-GS-GS-GS-C1-D3-D2-D1-GS-GS-GS-SLR ▪️Front SLR (Coach No.1) is LADIES coach. ▪️Number of General coaches may get reduced in some runs.▪️ Departure from Balurghat is cancelled on 18.12.19 & Will Run as Passanger Special Till Sealdah From Maldah Town With Same Route & Stoppage on 18.12.19.
News Entry# 0 ▪️One rake has CC as: SLR-GS-GS-GS-GS-C1-D3-D2-D1-GS-GS-GS-SLR ▪️Front SLR (Coach No.1) is LADIES coach. ▪️Number of General coaches may get reduced in some runs.▪️ Departure from Balurghat is cancelled on 18.12.19
Attach: BRC/WAP-7 ADI/Ahmedabad Junction->BDTS/Bandra Terminus
Attach: SBI/WDP-4D BGKT/Bhagat ki Kothi->ADI/Ahmedabad Junction
Attach: BRC/WAP-7 ADI/Ahmedabad Junction->PUNE/Pune Junction
Detach: PUNE/WDP-4D PUNE/Pune Junction->GTL/Guntakal Junction
NEXT PAGE the next 5 Timeline Entries will appear below