Timeline of all Site Edits
LHB Rake; Eng Eog B9 B8 B7 B6 B5 B4 B3 B2 B1 PC A4 A3 A2 A1 H1 SLR
Rake Notes:
LHB Rake; Eng Eog H1 A4 A3 A2 A1 PC B9 B8 B7 B6 B5 B4 B3 B2 B1 SLR
SC/Secunderabad Junction (10 PFs): 3,4
SC/Secunderabad Junction (10 PFs): 2,4,5
LTT/Mumbai LTT (5 PFs): 2,3
LTT/Mumbai Lokmanya Tilak Terminus (5): 2
130 km/hr between HDP/Hadapsar (Pune) and DD/Daund Junction
110 km/hr between LNL/Lonavala and LPI/Lingampalli
130 km/hr between DD/Daund Junction and HDP/Hadapsar (Pune)
110 km/hr between LPI/Lingampalli and LNL/Lonavala