Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

इस मंज़िल पर मिलने वाले, उस मंज़िल पर दोस्त बन जाते हैं

Full Site Search
  Full Site Search  
 
Sun Apr 18 20:30:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

UBL/SSS Hubballi Junction (Hubli) (5 PFs)
ಶ್ರೀ ಸಿದ್ಧಾರೂಢ ಸ್ವಾಮೀಜಿ (ಹುಬ್ಬಳ್ಳಿ) ಜಂಕ್ಷನ್     श्री सिद्धारूढा स्वामीजी (हुब्बल्लि) जंक्शन

Track: Construction - Doubling+Electrification

Show ALL Trains
Jn Pts: GDG, BAY/JRU, ASK/LD, MRJ, Gadag Road, Hubballi - 580020, Tel: 0836 - 2266702
State: Karnataka


Zone: SWR/South Western   Division: SSS Hubballi (Hubli)

No Recent News for UBL/SSS Hubballi Junction (Hubli)
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 5
Number of Halting Trains: 86
Number of Originating Trains: 37
Number of Terminating Trains: 37
Rating: 4.2/5 (170 votes)
cleanliness - excellent (24)
porters/escalators - good (19)
food - good (21)
transportation - good (21)
lodging - good (20)
railfanning - excellent (20)
sightseeing - good (22)
safety - excellent (23)
Show ALL Trains

Station News

Page#    Showing 1 to 20 of 482 News Items  next>>
Apr 09 (12:01) Rail Platform Tickets: सेंट्रल रेलवे का बड़ा फैसला, इन स्टेशनों पर प्लेटफॉर्म ब्रिकी पर तत्काल प्रभाव से रोक (www.naidunia.com)
IR Affairs
CR/Central
0 Followers
8177 views

News Entry# 448213  Blog Entry# 4933832   
  Past Edits
Apr 09 2021 (12:02)
Station Tag: Yesvantpur Junction/YPR added by Adittyaa Sharma/1421836

Apr 09 2021 (12:02)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Chhatrapati Shivaji Maharaj Terminus/CSMT added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Panvel Junction/PNVL added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Dadar Central/DR added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Thane/TNA added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Kalyan Junction/KYN added by Adittyaa Sharma/1421836

Apr 09 2021 (12:01)
Station Tag: Lokmanya Tilak Terminus/LTT added by Adittyaa Sharma/1421836
Rail Platform Tickets: महाराष्ट्र में बेकाबू होते कोरोना के बीच सेंट्रल रेलवे ने बड़ा फैसला लिया है। मध्य रेलवे के सीपीआरओ के मुताबिक, लोमकन्या तिलक टर्मिनस, कल्याण, ठाणे, दादर, पनवेल, छत्रपति शिवाजी महाराज टर्मिनस रेलवे स्टेशनों पर तत्काल प्रभाव से प्लेटफॉर्म टिकटों की बिक्री पर रोक लगा दी गई है। रेलवे प्लेटफॉर्म पर लोगों की भीड़ रोकने के लिए यह फैसला किया है। बता दें, कोरोना महामारी के बीच रेलवे ने कई ट्रेनों का संचालन शुरू किया है। 5 अप्रैल से 71 अनारक्षित ट्रेनें चलाई हैं जबकि 10 अप्रैल से शताब्दी, दुरंतो, हमसफर ट्रेनें चलाने की योजना बन चुकी है। इस बीच, विभिन्न शहरों में लॉकडाउन की खबरों के बीच मजदूरों का पलायन शूरू हो गया है।
ऐसे ही हाताल के बीच
...
more...
कर्नाटक में बस ऑपरेटरों ने हड़ताल कर दी है। इसके बाद सरकार ने रेलवे से कहा है कि वह बेंगलुरू से चलने वाली ट्रेनों की संख्या बढ़ा दे। कर्नाटक के मुख्य सचिव के अनुरोध पर रेलवे बोर्ड ने राज्य में विभिन्न गंतव्यों के लिए 9 अप्रैल से 14 अप्रैल तक विशेष ट्रेनें चलाने की अनुमति दी है। दक्षिण पश्चिम रेलवे (SWR) ने हुबली से यशवंतपुर के लिए 16 डिब्बों वाली एक विशेष ट्रेन चलाने का फैसला किया है। शुक्रवार और शनिवार को 9-9 विशेष ट्रेनें चलाई जाएंगी।
Apr 08 (11:25) South Western Railway to run 9 pairs of trains amid bus strike (www.deccanherald.com)
New/Special Trains
SWR/South Western
0 Followers
13971 views

News Entry# 448129  Blog Entry# 4932869   
  Past Edits
Apr 08 2021 (11:25)
Station Tag: Mangaluru Junction (Mangalore)/MAJN added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Karwar/KAWR added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Shivamogga Town (Shimoga)/SMET added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Belagavi (Belgaum)/BGM added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Bidar/BIDR added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Kalaburagi Junction (Gulbarga)/KLBG added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Vijayapura (Bijapur)/BJP added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Mysuru Junction (Mysore)/MYS added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335

Apr 08 2021 (11:25)
Station Tag: Yesvantpur Junction/YPR added by Bjp Majn Exp via Mao and Bidr Majn Exp via Bay/48335
The 18 trains will have special fares and operate on different days
The railways will run nine pairs of trains with limited services between Bengaluru and many districts across the state to cater to the festival rush in view of the strike called by the workers of state road transport corporations (RTC).
Also Read | Karnataka govt requests railways to run over 10 more trains amid RTC strike
As
...
more...
per a release by the South Western Railway, the 18 trains will have special fares and operate on different days. The first of these is the special train from Hubballi to Yashwantpur (06545) which will run on Thursday.
Trains have been deployed on Yashwantpur-Vijayapura, Yashwantpur-Belagavi, Yashwantpur-Bidar and Mysuru-Bidar, Shivamogga-Bengaluru, Mysuru-Bengaluru and Karwar-Yashwantpur.

Apr 07 (17:41) Press Release No. 17, GM SWR INSPECTED HEADQUARTERS AND HUBBALLI DIVISION (swr.indianrailways.gov.in)
Other News
SWR/South Western
IR Press Release
0 Followers
8933 views

News Entry# 448073  Blog Entry# 4932185   
  Past Edits
Apr 07 2021 (17:41)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by ForeverRailfan/248735
GM SWR INSPECTED HEADQUARTERS AND HUBBALLI DIVISION
Shri Gajanan Mallya, GM SCR, with additional charge as GM SWR o­n his maiden visit to SWR today, held a review meeting with senior officers of the Headquarters and Hubballi Division. He reviewed the operational aspects of the Hubballi Yard which has been remodeled recently. The yard is now equipped with double lines o­n all 3 sides i.e. towards Gadag (towards Vijayapura), Dharwad (towards Goa) and Bengaluru side. The yard is equipped with state of the art Electronic Interlocking with 502 routes. Shri Mallya inspected the Station Master's Panel Room, Signal Cabins and the yard.
Shri
...
more...
Gajanan Mallya inspected Hubballi Yard after remodelling and reviewed the progress of the third entry to the Hubballi Station. The team of officers led by Shri Aravind Malkhede, Divisional Railway Manager Hubballi was present comprising of officers from Operating, Commercial, Signal & Telecom and Engineering departments. The project is done at an approximate cost of Rs. 115 crores under the Chief Engineer Shri Prem Narayan of the Railways Construction Department.
SALIENT FEATURE OF HUBBALLI YARD (Commissioned o­n 24.02.2021)
ØNumber of platforms has been increased from five to eight.
ØExisting platform No. 1 has been extended linearally to provide platform No. 8 thus creating the longest platform length of 1505 m.
ØDoubling has been done in three directions i.e., towards Dharwad end, Bengaluru end & Gadag end.
ØNumber of main lines have been increased from two to four.
ØYard remodelling was involved with dismantling of 47 numbers of points & crossings and laying of 62 numbers of new points & crossings.
ØAdditional 7.8 kms of track has been added to the yard including two new stabling lines facilitating various movements.
ØAdditional platform shelter of 2888 sqms o­n PF No. 6 and 5888 sqms o­n PF No. 7 & 8 has been provided.
ØNew pedestrian subway has been provided.
ØOne limited height subway has been provided for eliminating level crossing.
ØThree new cabins buildings have been provided for electronic interlocking.
ØNew station building (third entry) has been provided.
ØCost involved for civil infrastructure is Rs. 55 Crores i.e., for earthwork, bridges, buildings and platforms.
ØCost involved in track linking, modifications and P.Way materials is Rs. 32 Crores
ØCost involved in electronic interlocking including cabins is Rs. 28 Crores.
ØNumber of routes in existing yard has been increased from 350 to 502 Numbers.
                                                                   Chief Public Relations Officer                                                                     South Western Railway, Hubballi
Mar 31 (13:18) Superfast train between Hubballi and Bengaluru soon: Pralhad Joshi (www.deccanherald.com)
New/Special Trains
SWR/South Western
0 Followers
20267 views

News Entry# 447403  Blog Entry# 4924829   
  Past Edits
Mar 31 2021 (13:19)
Station Tag: Belagavi (Belgaum)/BGM added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (13:18)
Station Tag: Davangere/DVG added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (13:18)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (13:18)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by GIN bypass needed for Ggvt Hpt Ypr exp/48335
Joshi said South Western Railway officials have been asked to send a proposal in this regard to the railway ministry and central railway board
Union Parliamentary Affairs Minister Pralhad Joshi said Railway Minister Piyush Goyal has in-principle approved for a superfast train between Hubballi and Bengaluru, once the Covid-19 pandemic subsides.
Speaking to media persons here on Saturday, Joshi said South Western Railway officials have been asked to send a proposal in this regard to the railway ministry and central railway board.
“Goyal
...
more...
and board members have agreed to run the superfast express between Hubballi and Bengaluru as soon as the Covid-19 situation comes under control in state. Within the next six months, this superfast train is expected to ply between the two cities. Currently, the trains take eight hours to cover the distance (of near 410 km). However, the superfast express will cover this distance in 6 hours,” he said.
Read | 'Rly projects better implemented in K'taka under NDA'
“Doubling and railway line electrification between Hubballi and Bengaluru is taking place in full swing and expected to be completed in six months,” he said and added that efforts are being made to fulfil late Suresh Angadi’s (former minister of state for railways) dream of direct train between Belagavi and Dharwad via Kittur. With this, the travel time between Belagavi and Bengaluru (which is currently, 10 hours), is expected to come down to six-and-half hours.
Joshi also instructed the SWR officials to send a proposal to start a demo train between Hubballi and Davangere.
Political compulsion
The Union Minister said BJP central committee took the decision of fielding Mangala Angadi, wife of late Suresh Angadi, due to political compulsions and demand from the local leaders. “Political compulsion after the death of Anant Kumar was completely different from Belagavi issue, which is why Tejaswini Anant Kumar could not get a ticket. Based on the winnability factor the party has selected Mangala. Prime Minister Narendra Modi’s charisma and late Suresh Angadi’s work for Belagavi will help BJP win the seat,” he said




Mar 31 (10:20) SWR started trains from Bengaluru to Hubballi, Hosapete (www.deccanherald.com)
New/Special Trains
SWR/South Western
0 Followers
14260 views

News Entry# 447383  Blog Entry# 4924598   
  Past Edits
Mar 31 2021 (10:20)
Station Tag: Harihar/HRR added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (10:20)
Station Tag: Davangere/DVG added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (10:20)
Station Tag: Ballari Junction (Bellary)/BAY added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (10:20)
Station Tag: Hosapete Junction (Hospet)/HPT added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (10:20)
Station Tag: SSS Hubballi Junction (Hubli)/UBL added by GIN bypass needed for Ggvt Hpt Ypr exp/48335

Mar 31 2021 (10:20)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by GIN bypass needed for Ggvt Hpt Ypr exp/48335
The Hubballi-KSR Bengaluru Daily Express Special (06242) will commence operation from March 10
Continuing its efforts to restart the trains cancelled due to the lockdown, the South Western Railway (SWR) will run two express trains from Bengaluru to Hubballi and Hosapete as well as another train between Hosapete and Harihar.
The Hubballi-KSR Bengaluru Daily Express Special (06242) will commence operation from March 10. The train will leave Hubballi at 6 pm.
From
...
more...
Bengaluru, the train (06241) service will commence on March 12. The train will leave KSR Bengaluru at 11.55 pm and arrive at Hubballi at 10 am. The KSR Bengaluru-Hosapete Daily Express Special (06243) will commence operation from March 11. The train will depart Bengaluru at 5 am.
From Hosapete, the train (06244) service will begin from March 12. The train will depart Hosapete at 12.10 pm. The Hosapete-Harihar Daily Unreserved Express Special will commence operations from Hosapete on March 11. The train (06345) will depart from Hosapete at 4 pm.
The service from Harihar will commence from March 12. The train (06246) will leave Harihar at 4 pm every day.
Page#    Showing 1 to 20 of 482 News Items  next>>

Go to Full Mobile site