Please wait...
TIR/Tirur (3 PFs)तिरुर
തിരൂർ
Track: Double Electric-Line
Updated: Jan 16 2023 (11:05)
Tirur, Malappuram,Tel: 0494 2422240 State: Kerala
Elevation: 9 m above sea level Type: Regular Category: NSG-3Zone: SR/Southern Division: Palakkad (Palghat)
| Number of Platforms: 3 Number of Halting Trains: 94 Number of Originating Trains: 0 Number of Terminating Trains: 0 | Rating: 3.8/5 (61 votes) porters/escalators - average (7) transportation - excellent (8) |
Picture & Video Gallery
12075/Kzhkd Thrvnnthprm TIR/Trr
CLT-TVC JS is arriving at Tirur with WAP-7
TIR/Trr
Latest status of tirur traction substation - some progress, still a...
TIR/Trr
March 2015 Electrification completed from Shornur to KalayyiJune 2016 Electrification inaugrated...
16159/Chnn Egmr TIR/Trr
16859 MS-MAQ Exp arrives Tirur station
22114/Kchvl Mmb TIR/Trr
Customary link KYN Alco arriving TIR with 22114 KCVL- LTT Bi...
12617/Mngl Lkshdwp SF Exprss TIR/Trr
Mangala express powered by an offlink, UBL WDP 4B, accelerates over...
16160/Mnglr Cntrl TIR/Trr
GOC WDP 4B 40067 races towards its next halt Tirur,with MAQ-MS...
12601/MGR Chnn Cntrl TIR/Trr
180 minutes late running .1 mail @ TIR today
16348/Mnglr Cntrl TIR/Trr
Train No. 16348 arriving at Tirur
TIR/Trr
Tirur #SB
12075/Kzhkd Thrvnnthprm TIR/Trr
CLT-TVC JS is arriving at Tirur with WAP-7
TIR/Trr
Latest status of tirur traction substation - some progress, still a...
TIR/Trr
March 2015 Electrification completed from Shornur to KalayyiJune 2016 Electrification inaugrated...
TIR/Trr
Tirur traction substation work progress...bad quality photo due to dirty 3A...
TIR/Trr
Atlast some progress on Tirur substation, even though slow can atleast...
TIR/Trr
Status of Tirur traction substation in Shornur-Mangalore section which comes under...
56663/Thrssr Kzhkd TIR/Trr
56663 redying to depart from TIR yesterday
22610/Cmbtr Mnglr TIR/Trr
22610 @ TIR today
16605/Ernd Exprss TIR/Trr
ERS WDM 2 18537 charging towards TIR with 16605 MAQ-NCJ ERNAD...
TIR/Trr
Tirur #SB
12075/Kzhkd Thrvnnthprm TIR/Trr
CLT-TVC JS is arriving at Tirur with WAP-7
TIR/Trr
Latest status of tirur traction substation - some progress, still a...
16159/Chnn Egmr TIR/Trr
16859 MS-MAQ Exp arrives Tirur station
TIR/Trr
Tirur traction substation work progress...bad quality photo due to dirty 3A...
16607/Knnr Cmbtr TIR/Trr
56650 @ TIR today
TIR/Trr
Status of Tirur traction substation in Shornur-Mangalore section which comes under...
56663/Thrssr Kzhkd TIR/Trr
56663 redying to depart from TIR yesterday
22610/Cmbtr Mnglr TIR/Trr
22610 @ TIR today
16306/Knnr Ernklm TIR/Trr
Offlink ED WDG 3A 14667 going for its next halt TIR...
12075/Kzhkd Thrvnnthprm TIR/Trr
CLT-TVC JS is arriving at Tirur with WAP-7
PGT/Plkkd Plght
Palakkad Division going to install 40 Water vending machines at Palakkad,...
16159/Chnn Egmr TIR/Trr
16859 MS-MAQ Exp arrives Tirur station
TIR/Trr
Tirur traction substation work progress...bad quality photo due to dirty 3A...
16324/Mnglr Cntrl TIR/Trr
MAQ-CBE passenger charges towards TIR with GOC WDP 4D 40099...
TIR/Trr
Status of Tirur traction substation in Shornur-Mangalore section which comes under...
16649/Prsrm Exprss TIR/Trr
16649 arriving @ TIR today with GOC WDP4 .40105 in lead
TIR/Trr
sb Tirur
TIR/Trr
Gooty twins charging towards TIR..After a BCNA freight duty to Kallayi...
PGT/Plkkd Plght
Top 20 Revenue generating stations under palakkad division category based on...
TIR/Trr
March 2015 Electrification completed from Shornur to KalayyiJune 2016 Electrification inaugrated...
16159/Chnn Egmr TIR/Trr
16859 MS-MAQ Exp arrives Tirur station
TIR/Trr
Tirur traction substation work progress...bad quality photo due to dirty 3A...
16649/Prsrm Exprss TIR/Trr
Parasuram express powered by GOC WDP 4D 40099, crossing the bridge...
TIR/Trr
Status of Tirur traction substation in Shornur-Mangalore section which comes under...
12601/MGR Chnn Cntrl TIR/Trr
180 minutes late running .1 mail @ TIR today
TIR/Trr
sb Tirur
TIR/Trr
Tirur #SB