Click here for Full Mobile site


AB/Ambur to MAS/MGR Chennai Central
2 Mail/Express Trains

Shortest Route: 181.68 km

The Shortest Route passes through:
Katpadi => Arakkonam

2 Mail/Express Trains

16090/Yelagiri Express
ஏலகிரி விரைவு வண்டி     येलागिरी एक्सप्रेस
SMTWTFS
Travel Time: 3h 43m  12 halts  Distance: 181.68001 km
AB/Ambur
Departure @ 05:32
MAS/MGR Chennai Central
Arrival @ 09:15

IICC

TT Updated: Dec 07 2023 (21:39) by 1732257/SIVAPRAKASH P


16090/Yelagiri Express
ஏலகிரி விரைவு வண்டி     येलागिरी एक्सप्रेस


This is the Shortest Route between AB and MAS.
Travel Time: 3h 43m     12 halts
Distance: 182 km     Avg Speed: 48 km/hr
Max Permissible Speed: n/a
Departs @ 05:32
AB/Ambur 
Platform# 2
SMTWTFS
Arrives @ 09:15
MAS/MGR Chennai Ctrl 
Platform# 8
SMTWTFS
Type: Mail/Express
Zone: SR/Southern
ICF-CBC Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 GS
  5
 C1
  6
 GS
  7
 GS
  8
 GS
  9
 GS
 18
 GS
 17
 GS
 16
 GS
 15
 GS
 14
 GS
 13
 GS
 12
 GS
 11
 GS
 10
 GS
 19
 GS
 20
 GS
 21
 GS
 22
 GS
 23
 GS
 24
SLR
Rating: 3.8/5 (4 votes)
cleanliness - excellent (1)
punctuality - good (1)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - poor (1)
railfanning - good (1)
safety - average (1)
13352/Alappuzha - Dhanbad Express (PT)
ആലപ്പുഴ-ധൻബാദ്എ ക്സ് പ്രസ്സ്|||الاپّوژہ - دھنباد ایکسپریس|||     आलप्पुऴा - धनबाद एक्सप्रेस
SMTWTFS
Travel Time: 4h 0m  6 halts  Distance: 197.78998 km
VN/Vaniyambadi
16 km from AB/Ambur
Departure @ 17:35
MAS/MGR Chennai Central
Arrival @ 21:35

Road Side/RS Waitlist
IISL3A2A1A

TT Updated: Apr 13 (15:00) by 2111393/Beliefe


13352/Alappuzha - Dhanbad Express (PT)
ആലപ്പുഴ-ധൻബാദ്എ ക്സ് പ്രസ്സ്|||الاپّوژہ - دھنباد ایکسپریس|||     आलप्पुऴा - धनबाद एक्सप्रेस


This is the Shortest Route between VN and MAS.
Travel Time: 4h 0m     6 halts
Distance: 198 km     Avg Speed: 49 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 17:35
VN/Vaniyambadi 
(16 km from AB/Ambur)
Platform# 2
SMTWTFS
Arrives @ 21:35
MAS/MGR Chennai Ctrl 
Platform# 9
SMTWTFS
Type: Mail/Express
Zone: ECR/East Central
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
GEN
  3
GEN
  4
 S5
  5
 S4
  6
 S3
  7
 S2
  8
 S1
  9
 PC
 18
 A2
 17
 A3
 16
 A4
 15
 B1
 14
 B2
 13
 B3
 12
 B4
 11
 B5
 10
 B6
 19
 A1
 20
 H1
 21
SLR
 MAS
Rating: 3.1/5 (141 votes)
cleanliness - average (24)
punctuality - good (24)
food - average (23)
ticket avbl - average (24)
u/r coach - average (12)
railfanning - good (22)
safety - good (24)
Go to Full Mobile site