Close-up; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3832900-0
Close-up; Side View; Small TB; 2 AC; Outside of Train;
Entry# 4473811-0


11035/Sharavati Express (PT)
शरावती एक्सप्रेस

DR/Dadar Central --> MYS/Mysuru Junction (Mysore)

Availability Calendar
Search DR to MYS
Return# 11036
PDF Download
Latest News
(You need to double-check/verify this info yourself)
🔹 Train No. 11035 Dadar – Mysuru Sharavathi Weekly Express, starting from Dadar o­n March 30, 2023 will be diverted to run via SSS Hubballi, Hosapete bypass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at Haveri, Ranibennur & Harihar stations.
Wed Mar 22, 2023 (10:34AM)
News History
🔹Train No. 11035 Dadar – Mysuru Sharavathi Weekly Express, starting from Dadar o­n March 16, 2023 will be diverted to run via SSS Hubballi, Hosapete by-pass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at SMM Haveri, Ranibennur & Harihar.
Fri Mar 10, 2023 (06:35PM)
• JCO 02.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri, Ranibennur & Harihar due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.
Wed Mar 01, 2023 (02:30PM)
• JCO 02.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri, Ranibennur & Haveri due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.
Wed Mar 01, 2023 (02:19PM)
• JCO 26.01.2023 will be regulated for 30 min enroute due to line block for engineering works between Kundgol and Hubballi South Stations over SWR. • JCO 26.01.2023 & 02.02.2023 will be diverted via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere due to engineering works for commissioning...
more...
of Kundgol phase I work as part of doubling of Chikjajur - Hubballi section over SWR.
Thu Jan 26, 2023 (09:29PM)
• JCO 26.01.2023 will be regulated for 30 min enroute due to line block for engineering works between Kundgol and Hubballi South Stations over SWR.
Thu Jan 26, 2023 (08:52PM)
Permanently Augmented with 1 AC 3-Tier Coach
Thu Jan 13, 2022 (09:14AM)
Train Will be Augmented with one additional AC-3Tier coach WEF 13/01/2022
Mon Jan 10, 2022 (09:09AM)
Coach Composition: ┃2AC—1┃—┃3AC—3┃—┃SL—8┃—┃2S—3┃—┃SLR/D—2┃ 📢 Train no. 01035 will be reduced by 1 AC Three Tier Coach with effect from 08.04.2021 to 29.04.2021... 📢 JCO 22.07.2021 Will Remain Short Terminate at Pune
Thu Jul 22, 2021 (09:18AM)
5 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Aug 15, 1998
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at DR, KYN, BGM, UBL, HVR, HRR, DVG,...
more...
HAS & MYS.
Updated: Mar 06 (10:52) by ady_rajat^~
Dep:
Arr:
Rating: 4.6/5 (45 votes)
cleanliness - excellent (8)
punctuality - excellent (8)
food - good (7)
ticket avbl - good (7)
u/r coach - good (4)
railfanning - excellent (8)
safety - excellent (7)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 S8
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 10
 S2
 11
 S1
 12
 B3
 13
 B2
 14
 B1
 15
 A1
 16
 GS
 17
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Timeline


Siddharth98^~
May 11 2023 (23:17)
May 11 2023 (23:17)   Sharavati Express (PT)/11035   Train - Charting Time - PUNE/Pune Junction (6 PFs)
Entry# 5807273   Blog Entry# 5720287  
by: Siddharth98^~   34007 Conf TLs   208 Void TLs
20:00

Siddharth98^~
May 11 2023 (23:17)
May 11 2023 (23:17)   Sharavati Express (PT)/11035   Train - Halt Note - PUNE/Pune Junction (6 PFs)
Entry# 5807272   Blog Entry# 5720286  
by: Siddharth98^~   34007 Conf TLs   208 Void TLs
Remote Location Quota Starting and Charting Station

Nov 16 2019 (23:55)   (previous value)
Entry# 3002359
by: Reva18~


Sameer2905^~
Mar 22 2023 (10:34)
Mar 22 2023 (10:34)   Sharavati Express (PT)/11035   Train - News
Entry# 5698157   Blog Entry# 5672983  
by: Sameer2905^~   4986 Conf TLs   120 Void TLs
News Entry# 0
🔹 Train No. 11035 Dadar – Mysuru Sharavathi Weekly Express, starting from Dadar o­n March 30, 2023 will be diverted to run via SSS Hubballi, Hosapete bypass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at Haveri, Ranibennur & Harihar stations.

Mar 10 2023 (18:35)   (previous value)
Entry# 5672959
by: guest
News Entry# 0
🔹Train No. 11035 Dadar – Mysuru Sharavathi Weekly Express, starting from Dadar o­n March 16, 2023 will be diverted to run via SSS Hubballi, Hosapete by-pass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at SMM Haveri, Ranibennur & Harihar.

guest
Mar 10 2023 (18:35)
Mar 10 2023 (18:35)   Sharavati Express (PT)/11035   Train - News
Entry# 5672959   Blog Entry# 5660503  
by: guest   20923 Conf TLs   123 Void TLs
News Entry# 0
🔹Train No. 11035 Dadar Mysuru Sharavathi Weekly Express, starting from Dadar o­n March 16, 2023 will be diverted to run via SSS Hubballi, Hosapete by-pass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at SMM Haveri, Ranibennur & Harihar.

Mar 01 2023 (14:29)   (previous value)
Entry# 5653191
by: ady_rajat^~
JCO 02.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri, Ranibennur & Harihar due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.


Prateek_BSB^~
Mar 01 2023 (14:30)
Mar 01 2023 (14:29)   Sharavati Express (PT)/11035   Train - News
Entry# 5653191   Blog Entry# 5648792  
by: ady_rajat^~   3830 Conf TLs   52 Void TLs
JCO 02.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri, Ranibennur & Harihar due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.



Past Edits
Updated: Mar 01 2023 (14:19) by ady_rajat^~
Confirmed: Mar 01 2023 (14:27) by Prateek_BSB^~
News Entry# 0
• JCO 02.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri, Ranibennur & Haveri due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.

Jan 26 2023 (21:29)   (previous value)
Entry# 5584553
by: ady_rajat^~
News Entry# 0
JCO 26.01.2023 will be regulated for 30 min enroute due to line block for engineering works between Kundgol and Hubballi South Stations over SWR.
JCO 26.01.2023 & 02.02.2023 will be diverted via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere due to engineering works for commissioning of Kundgol phase I work as part of doubling of Chikjajur - Hubballi section over SWR.
Page#    226 timeline entries  <<prev  next>>

Go to Full Mobile site