Medium; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station; Standing;
Entry# 4206955-0
Close-up; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station; Standing;
Entry# 4673776-0
Medium; Side View; Small TB; EOG/SLR; Outside of Train;
Entry# 4757490-0

78532⇒58532/Visakhapatnam - Palasa Passenger (UnReserved)
విశాఖపట్నం - పలాసా ప్యాసింజర్     विशाखपट्टणम - पलासा पैसेंजर

VSKP/Visakhapatnam Junction --> PSA/Palasa

Availability Calendar
Search VSKP to PSA
Return# 58531
PDF Download
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
▪️ Services to resume from 09.05.19
Wed May 08, 2019 (11:47PM)
WARNING: Time-Table may have changed.
Updated: Jul 01 2019 (17:32) by x-under SW-x
Dep:
Arr:
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 GS
  5
 GS
  6
 GS
  7
 GS
  8
 GS
  9
 GS
 10
 GS
 11
 GS
 12
 GS
 13
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    9 News Items  
Keeping in view the aspirations and demands of daily commuters, East Coast Railway has decided to replace the toilet less coaches from Visakhapatnam-Palasa-Brahmapur-Bhubaneswar-Cuttack-Paradeep-Visakhapatnam DMU Passenger trains and will provide General Second Class coaches from 1stNovember, 2017.

It has also been decided to renumber and revise the timings of the above trains to avoid operational problems.

Train
...
more...
number 78532 & 78534 Visakhapatnam-Vizianagaram-Palasa passenger will be renumbered as 58532 Visakhapatnam-Palasa passenger and train number 78533 & 78531 Palasa-Vizianagaram-Visakhapatnam passenger will be renumbered as 58531 Palasa-Visakhapatnam passenger.

Train number 78506/78504/78502 Palasa-Brahmapur-Bhubaneswar-Cuttack passenger will be re-numbered as 58534 Palasa-Cuttack passenger and train number 78501/78503/78505 Cuttack-Bhubaneswar-Brahmapur-Palasa passenger will be renumbered as 58533 Cuttack-Palasa passenger.
Similarly, 78507 Cuttack-Paradeep passenger will be renumbered as 58535 and 78508 Paradeep-Cuttack passenger will be renumbered as 58536 Paradeep-Cuttack passenger.

The timings for the above trains have been revised in most of the Stations. Passengers are advised to plan their journey accordingly, after notification of new Time Table.
Apr 19 2016 (09:04) Run MEMU services between Tuni, Vizianagaram (www.thehindu.com)
Other News
SCR/South Central
0 Followers
36247 views

News Entry# 265092  Blog Entry# 1810204   
  Past Edits
Apr 19 2016 (9:10AM)
Station Tag: Srikakulam Road/CHE added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Chipurupalle/CPP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Vizianagaram Junction/VZM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Kottavalasa Junction/KTV added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Pendurti/PDT added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Simhachalam/SCM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Visakhapatnam Junction/VSKP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Duvvada/DVD added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Anakapalle/AKP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Elamanchili/YLM added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Narsipatnam Road/NRP added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Tuni/TUNI added by WAP7/1472033

Apr 19 2016 (9:10AM)
Station Tag: Annavaram/ANV added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Vizianagaram Junction/VZM added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Visakhapatnam Junction/VSKP added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Anakapalle/AKP added by WAP7/1472033

Apr 19 2016 (9:04AM)
Station Tag: Tuni/TUNI added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Visakhapatnam - Vizianagaram DMU/78532 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Vizianagaram - Visakhapatnam DEMU/78531 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Visakhapatnam-Kakinada Port Passenger/57256 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Kakinada Port-Visakhapatnam Passenger/57255 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Rayagada-Vijayawada Passenger/57272 added by WAP7/1472033

Apr 19 2016 (9:04AM)
Train Tag: Vijayawada-Rayagada Passenger/57271 added by WAP7/1472033
Posted by: x-under SW-x 17 news posts
Naresh, a government employee living in Anakapalle, and Achari, a teacher living in Vizianagaram, who commute to the city daily for work, find the lack of local trains a curse for commuters.
“Though there are trains from Anakapalle to Visakhapatnam, they do not match the actual demand. I have to board either 57271 BZA- Rayagada Passenger or 57255 Kakinada - Vizag EMU, which are already packed to capacity with hardly any space to get in,” says Naresh.
Mr. Achari travels from Vizianagaram to Visakhapatnam every day. He boards 78531 Vizianagaram-Visakhapatnam DEMU, which is
...
more...
packed to capacity with hardly any space to stand comfortably leave alone sitting in the train.
Both Naresh and Achari feel that there should be MEMU s (Mainline Electrical Multiple Unit) between Tuni/Anakapalle to Vizianagaram via Visakhapatnam after every 1 hour and a few services can be extended up to Annavaram one side (as it would meet the requirement of pilgrims travelling to Sri Satyanarayana Swamy temple) and Srikakulam on other side (as it would be useful to those going to Arasavalli and Srikurmam temples).
The introduction of the local trains would help in reducing the load on the National Highway and minimising road accidents. This is not all, the middle class and the poor will be saved the hassle of paying three or four times the fare for travel in buses.

Several important originating/terminating express trains as also some passing through trains, being taken on Platform No. 6 of Visakhapatnam Railway Station, are being operated from other platforms in view of repairs to the washable apron of PF-6, according to an official release.
The repairs, which started on Diwali Day, will continue for 45 days. The trains to start from new platforms are: Train No. 22848 Lokmanya Tilak Terminus- Visakhapatnam (via Rayagada), train No. 22204 Secunderabad-Visakhapatnam Duranto, train No.18511 Koraput-Visakhapatnam intercity express, train No.18512 Visakhapatnam-Koraput intercity express and the train No. 58538 Visakhapatnam-Koraput passenger train will arrive on platform No.3 instead of platform Mo.6.
Train
...
more...
No. 78532 Visakhapatnam-Vizianagaram passenger will start from platform No.2 instead of platform No.6, 18309 Sambalpur-Secunderabad express will arrive on platform No.1 instead of platform No.6, 22203 Visakhapatnam-Secunderabad Duranto express will be placed on platform No.5 instead of platform No.6, 18504 Shirdi-Visakhapatnam weekly express, 22884/ 22883 Yesvantpur-Puri-Yesvantpur Garibrath weekly expresses and the train No. 12740 Secunderabad-Visakhapatnam Garibrath will be received on platform No.8 instead of platform No.6, 00839 Howrah-Chennai AC Suvidha special express and the train No. 57272 will be received either on platform No. 1 or on platform No. 7 as per convenience.
Senior Divisional Commercial Manager M. Yelvender Yadav noted that the nomination of platforms may change subject to operational constraints like late running of trains.
Several important originating/terminating express trains as also some passing through trains, being taken on Platform No. 6 of Visakhapatnam Railway Station, are being operated from other platforms in view of repairs to the washable apron of PF-6, according to an official release.
The repairs, which started on Diwali Day, will continue for 45 days. The trains to start from new platforms are: Train No. 22848 Lokmanya Tilak Terminus- Visakhapatnam (via Rayagada), train No. 22204 Secunderabad-Visakhapatnam Duranto, train No.18511 Koraput-Visakhapatnam intercity express, train No.18512 Visakhapatnam-Koraput intercity express and the train No. 58538 Visakhapatnam-Koraput passenger train will arrive on platform No.3 instead of platform Mo.6.
Train
...
more...
No. 78532 Visakhapatnam-Vizianagaram passenger will start from platform No.2 instead of platform No.6, 18309 Sambalpur-Secunderabad express will arrive on platform No.1 instead of platform No.6, 22203 Visakhapatnam-Secunderabad Duranto express will be placed on platform No.5 instead of platform No.6, 18504 Shirdi-Visakhapatnam weekly express, 22884/ 22883 Yesvantpur-Puri-Yesvantpur Garibrath weekly expresses and the train No. 12740 Secunderabad-Visakhapatnam Garibrath will be received on platform No.8 instead of platform No.6, 00839 Howrah-Chennai AC Suvidha special express and the train No. 57272 will be received either on platform No. 1 or on platform No. 7 as per convenience.
Senior Divisional Commercial Manager M. Yelvender Yadav noted that the nomination of platforms may change subject to operational constraints like late running of trains.



VISAKHAPATNAM: From November 11 for the next 45 days, platform number 6 at Visakhapatnam railway station will be shut down for repairs and the trains arriving and exiting from there have been provided alternative platforms.
Train 22848 Lokmanya Tilak Terminus-Visakhapatnam and 22204 Secunderabad-Visakhapatnam Duranto, 18511 Koraput-Visakhapatnam intercity express, 18512 Visakhapatnam-Koraput intercity express and 58538 Visakhapatnam-Koraput passenger train will arrive on platform 3 instead of 6.
Similarly, 78532 Visakhapatnam-Vizianagaram passenger will originate from platform number 2, train 18309 Sambalpur-Secunderabad express will arrive on platform number 1, 22203 Visakhapatnam-Secunderabad Duranto express will start from 5,
...
more...
18504 Shirdi-Visakhapatnam weekly express, 22884/ 22883 Yesvantpur-Puri-Yesvantpur Garibrath weekly express and 12740 Secunderabad-Visakhapatnam Garibrath will be stationed on 8.
The 00839 Howrah-Chennai AC Suvidha special express will arrive on either 1 or 7 as per convenience. "However, the new platforms may be changed subject to operational constraints like late running of trains," M Yelvender Yadav, senior divisional commercial manager of Waltair division of East Coast Railway, said.



Page#    9 News Items  

Go to Full Mobile site