02247/Gwalior - Ahmedabad COVID - 19 SF Special
     ग्वालियर - अहमदाबाद कोविड - 19 सुपरफास्ट विशेष

GWL/Gwalior Junction --> ADI/Ahmedabad Junction

Availability Calendar
Search GWL to ADI
Return# 02248
PDF Download
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
2AC - 1 , 3AC - 3 , SL - 9 , 2S - 6
Thu Oct 01, 2020 (06:49PM)
Updated: Dec 02 2020 (11:03) by 12611_MAS_GARIB^~
Dep:
Arr:
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 S1
  3
 S2
  4
 S3
  5
 S4
  6
 S5
  7
 S6
  8
 S7
  9
 S8
 10
 S9
 11
 A1
 12
 B1
 13
 B2
 14
 B3
 15
 D1
 16
 D2
 17
 D3
 18
 D4
 19
 D5
 20
 D6
 21
EOG
First Departure: Sat Oct 03, 2020 from GWL/Gwalior Junction
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    7 News Items  
शताब्दी को भी छह दिन चलाएगा रेलवे। ट्रेनों में भी लगाए जा रहे अतिरिक्त कोच। प्रत्येक रूट पर यात्रियों की बढ़ती संख्या को देखते हुए एक बार फिर तेजस के चलने की उम्मीद बढ़ गई है। सेमी हाईस्पीड ट्रेन तेजस चलाने के लिए विचार चल रहा है।
कानपुर, जेएनएन। कोरोना संक्रमण का असर जैसे जैसे धीमा हाे रहा है और वैक्सीन महानगरों तक पहुंचने लगी है, यात्रियों में भी सफर के प्रति डर खत्म हुआ है। यही कारण है कि दिल्ली, मुंबई और बिहार के लिए यात्री लोड बढ़ा तो आइआरसीटीसी की भारत दर्शन ट्रेन को भी 602 यात्री मिल गए।
दिल्ली
...
more...
के साथ ही पटना और मुंबई के लिए यात्री लोड अब मिलने लगा है। जिसके चलते रेलवे ने शताब्दी सहित कई ट्रेनों के फेरे बढ़ा दिए हैं। शताब्दी जब शुरू की गई थी तब रविवार को छोड़कर सप्ताह में छह दिन चलायी जा रही थी। हालांकि यात्री लोड न मिलने से इसे तीन दिन कर दिया गया। 
फरवरी से फिर बदलेगी व्यवस्था 
अब पुन: शताब्दी एक फरवरी से छह दिन चलायी जाएगी। ट्रेन संख्या 4185 ग्वालियर बरौनी को भी अब हर दिन चलाने का निर्णय लिया गया है। यह ट्रेन भी एक फरवरी से एक मार्च तक चलायी जाएगी। अभी यह ट्रेन सोमवार और गुरुवार को छोड़कर सप्ताह में पांच दिन चलायी जा रही थी। इसी तरह प्रयागराज से उधमपुर के लिए चल रही साप्ताहिक ट्रेन को दो दिन कर दिया गया है। दो फरवरी से 28 फरवरी तक यह ट्रेन चलायी जाएगी। यात्री लोड बढ़ने के चलते कुछ ट्रेनों में अतिरिक्त कोच भी रेलवे ने जोड़े हैं। 
फिर शुरू हो सकती है तेजस
प्रत्येक रूट पर यात्रियों की बढ़ती संख्या को देखते हुए एक बार फिर तेजस के चलने की उम्मीद बढ़ गई है। आइआरसीटीसी अधिकारी बताते हैं कि सेती हाईस्पीड ट्रेन तेजस चलाने के लिए विचार चल रहा है। इस बार समस्त पर्यवेक्षीय आंकलन के बाद ही तेजस को शुरू किया जाएगा। 
इन ट्रेनों के सप्ताहिक फेरे बढ़े
- ट्रेन संख्या 02033 कानपुर नई दिल्ली
- ट्रेन संख्या 04131 प्रयागराज उधमपुर
- ट्रेन संख्या 04185 ग्वालियर बरौनी 
इन ट्रेनों के फेरे बढ़ चुके हैं
- ट्रेन संख्या 02521 बरौनी से मुन्नार
- ट्रेन संख्या 02397 बोधगया से नई दिल्ली
- ट्रेन संख्या 02395 राजेंद्र नगर से अजमेर 
- ट्रेन संख्या 05269 मुजफ्फरपुर से अहमदाबाद 
इन ट्रेनों में अतिरिक्त कोच जोड़े 
-ट्रेन संख्या 04161 कानपुर सेंट्रल आनंद विहार टर्मिनल में दो
-ट्रेन संख्या 02243 कानपुर सेंट्रल बांद्रा में दो  
-ट्रेन संख्या 04115 प्रयागराज अंबेडकर नगर में तीन 
-ट्रेन संख्या 02247 ग्वालियर अहमदाबाद में एक 
-ट्रेन संख्या 02547 आगरा अहमदाबाद एक 
इनका ये है कहना 
यात्रियों की सुविधाओं को देखते हुए ही ट्रेनों के फेरे और कोच बढ़ाने का निर्णय लिया जा रहा है। जरूरत हुई तो और विशेष ट्रेनें चलायी जाएंगी। 
- अमित मालवीय, जनसंपर्क अधिकारी उत्तर मध्य रेलवे
Dec 13 2020 (08:06) कोरोनाकाल में यात्रियों के लिए अच्छी खबर:अहमदाबाद के लिए फ्लाइट 24 से, सप्ताह में 3 दिन चलेगी (dainik-b.in)
Other News
NCR/North Central
0 Followers
7890 views

News Entry# 428280  Blog Entry# 4811296   
  Past Edits
Dec 13 2020 (08:07)
Station Tag: Ahmedabad Junction/ADI added by Need stoppage of Singrauli Exp/1887927

Dec 13 2020 (08:07)
Station Tag: Gwalior Junction/GWL added by Need stoppage of Singrauli Exp/1887927

Dec 13 2020 (08:07)
Train Tag: Ahmedabad - Gwalior COVID - 19 SF Special/02248 added by Need stoppage of Singrauli Exp/1887927

Dec 13 2020 (08:07)
Train Tag: Gwalior - Ahmedabad COVID - 19 SF Special/02247 added by Need stoppage of Singrauli Exp/1887927
Posted by: aryan89~ 112 news posts
कोरोनाकाल में अंचल के यात्रियों के लिए अच्छी खबर है। 24 दिसंबर से स्पाइसजेट अहमदाबाद से ग्वालियर के लिए नई उड़ान सेवा शुरू करने जा रहा है। यह फ्लाइट सप्ताह में तीन दिन मंगलवार, गुुरुवार और शनिवार को अहमदाबाद से ग्वालियर आएगी और जाएगी।
खास बात यह है कि अहमदाबाद से यात्री पुणे के लिए कनेक्टिंग फ्लाइट भी पकड़ सकेंगे। इसके लिए यात्रियों को एयरपोर्ट पर करीब 3:30 घंटे इंतजार करना पड़ेगा। अहमदाबाद की फ्लाइट से यात्रा करने पर यात्रियों को एक से सवा घंटे लगेगा। जबकि ग्वालियर से अहमदाबाद ट्रेन से सफर करने पर यात्रियों के 12:20 घंटे मिनट लगते हैं।
स्पाइसजेट
...
more...
ने इस उड़ान सेवा को 24 दिसंबर से 27 मार्च 2021 तक के लिए शुरू किया है। यदि यात्रियों का अच्छा रिस्पांस मिला तो इस फ्लाइट को आगे भी चलती रहेगी। अहमदाबाद से ग्वालियर के लिए जल्द ही टिकट बुकिंग शुरू हो जाएगी।
फ्लाइट के प्रस्थान व आगमन का समयकहां से कहां प्रस्थान आगमनअहमदाबाद से ग्वालियर सुबह 9:25 10:30 बजेग्वालियर से अहमदाबाद सुबह 11 1:10 बजे
फ्लाइट का शेड्यूल जारी किया^24 मार्च से अहमदाबाद से ग्वालियर के लिए नई उड़ान सेवा शुरू हो रही है। यह उड़ान सेवा सप्ताह में 3 दिन रहेगी। स्पाइसजेट की फ्लाइट के चलने का शेड्यूल जारी कर दिया गया है।-वसीम अंसारी, निदेशक, एयरपोर्ट
Indian Railways' Western Railway zone has announced that starting from 01 December,timings of Rajdhani and Shatabdi Express leaving from Mumbai has been revised.
Meanwhile, the Mumbai Central – New Delhi Rajdhani has been given a additional halt at Borivali station from 01 December but the August Kranti Rajdhani's halt at Andheri station has been withdrawn.
Western Railways has also announced the revision in timings of some other trains that operates from its zone.
Check
...
more...
the full revised train timings below:
1) Train No.02951/02952 Mumbai Central – New Delhi Rajdhani Special Express (Daily)
Train No.02951 Mumbai Central – New Delhi Rajdhani Special Express will depart from Mumbai Central at 17.00 hrs w.e.f 1st Dec 2020, instead of 17.30 hrs. Additional halt has been provided at Borivali station in both directions. The revised timings of arrival/ departure at enroute stations will be Borivali (17.22/17.24), Surat (19.43/19.48), Vadodara (21.03/21.13), Ratlam (00.25/ 00.28) and Kota (03.15/03.20). The train will reach New Delhi at 08.32 hrs. Similarly, Train No. 02952 New Delhi – Mumbai Central Rajdhani Special Express will depart New Delhi at 16.55 hrs w.e.f 2nd Dec, 2020 instead of 17.00 hrs. The revised timings of arrival/ departure at enroute stations will be Kota (21.30/21.40), Ratlam (00.27/00.30), Vadodara (03.40/03.50), Surat (05.13/05.18) and Borivali (07.42/07.44). The train will arrive at Mumbai Central at 08.35 hrs.
2) Train No.02953/02954 Mumbai Central – H. Nizamuddin August Kranti Rajdhani Special Express (Daily)
Train No.02953 Mumbai Central – H. Nizamuddin August Kranti Rajdhani Special Express will depart from Mumbai Central at 17.10 hrs w.e.f 1st Dec, 2020, instead of 17.40 hrs. The halt at Andheri station of this train has been withdrawn. The timings of arrival /departure at enroute stations will be Borivali (17.33/ 17.35), Vapi (18.54/18.57), Valsad (19.17/ 19.19), Surat (20.10/20.15), Bharuch (20.49/ 20.51), Vadodara (21.40/ 21.49), Ratlam (01.13/ 01.15), Kota (04.10 /04.20), Sawai Madhopur (05.23/ 05.25) and Mathura Jn (07.58/ 08.00). The train will reach at H. Nizamuddin at 09.43 hrs. Similarly, Train No. 02954 H. Nizamuddin – Mumbai Central August Kranti Rajdhani Special Express will depart H. Nizamuddin at 17.15 hrs w.e.f 2nd Dec, 2020 instead of 17.20 hrs. The timings of arrival/ departure at enroute stations will be Mathura Jn (18.43/ 18.45), Sawai Madhopur (20.48 /20.50), Kota (22.00/ 22.10), Ratlam (01.05/ 01.07), Vadodara (04.26/ 04.34), Bharuch (05.19/ 05.21), Surat (06.13/ 06.18), Valsad (07.08/ 07.10), Vapi (07.27/ 07.29) and Borivali (09.10/ 09.12) stations in both directions. The train will arrive at Mumbai Central at 10.05 hrs.
3) Train No.02009/02010 Mumbai Central – Ahmedabad Shatabdi Special Express (6 days a week)
Train No.02009 Mumbai Central – Ahmedabad Shatabdi Special Express will depart from Mumbai Central at 06.40 hrs, instead of 06.30 hrs w.e.f 1st Dec, 2020. The timings of arrival/departure at enroute stations will be Borivali (07.01/ 07.04), Vapi (08.27/ 08.29), Surat (09.34/ 09.39), Bharuch (10.13/ 10.15), Vadodara (11.05/ 11.10), Anand (11.43/ 11.44) and Nadiad (11.59/ 12.00). The train will reach at Ahmedabad at 13.00 hrs. Similarly, Train No.02010 Ahmedabad – Mumbai Central Shatabdi Special Express will depart Ahmedabad at 14.50 hrs instead of 14.45 hrs w.ef 1st Dec, 2020. The timings of arrival/ departure at enroute stations will be Nadiad (15.19/ 15.21), Anand (15.35 /15.37), Vadodara (16.07/ 16.12), Bharuch (16.59/ 17.01), Surat (17.50/ 17.55), Vapi (18.56/ 18.58) and Borivali (20.25/ 20.28). The train will arrive at Mumbai Central at 21.20 hrs.
4) Train No.02244/02243 Bandra Terminus – Kanpur Central Superfast Special (Weekly)
Train No.02244 Bandra (T) – Kanpur Central Special will depart from Bandra (T) at 05.10 hrs w.e.f 4th Dec, 2020. The timings of arrival/departure at enroute stations over WR will be Borivali (05.30/05.33), Vapi (07.12/07.14), Surat (08.32/08.37), Bharuch (09.17/09.19), Vadodara (10.24/10.34), Godhra Jn (11.55/11.57), Ratlam (14.20/14.40), Nagda (15.33/ 15.35), The train will reach Kanpur Central at 07.15 hrs. Similarly, Train No.02243 Kanpur Central – Bandra (T) Special will depart Kanpur Central at 18.25 hrs instead of 18.20 hrs w.e.f 2nd Dec, 2020. The timings of arrival/departure at enroute stations over WR will be Nagda (09.33/09.35), Ratlam (10.10/10.30), Godhra (13.23/13.25), Vadodara (14.19/14.29), Bharuch (15.28/15.30), Surat (16.55/17.00), Vapi (18.08/18.10) and Borivali (20.08/20.10). The train will arrive Bandra (T) at 20.55 hrs.
5) Train No.02248/02247 Sabarmati - Gwalior Superfast Special (Tri-Weekly)
Train No.02248 Sabarmati – Gwalior Special will depart from Sabarmati at 16.50 hrs w.e.f. 28th Nov, 2020. This pair of train which was earlier originating/terminating at Ahmedabad station will now originate/terminate from Sabarmati station. The timings of arrival/departure at enroute stations over WR will be Mahesana (17.38/17.40) and Palanpur (19.03/19.05. The train will reach Gwalior at 09.25 hrs. Similarly, Train No.02247 Gwalior - Sabarmati Special will depart Gwalior at 20.10 hrs w.e.f 28th Nov, 2020. The timings of arrival/departure at enroute stations over WR will be Palanpur (09.42/09.44) and Mahesana (10.28/10.30) . The train will reach Sabarmati at 11.50 hrs.
6) Train No.02548/02547 Sabarmati-Agra Cantt Superfast Special (4 days a week)
Train No. 02548 Sabarmati – Agra Cantt Special will depart from Sabarmati at 16.50 hrs w.e.f 29th Nov, 2020. This pair of train which was earlier originating/terminating at Ahmedabad station will now originate/terminate from Sabarmati station The timings of arrival/departure at enroute stations on WR will be Mahesana (17.38/17.40) and Palanpur (19.03/19.05). The train will reach Agra Cantt at 07.15 hrs. Similarly, Train No.02547 Agra Cantt - Sabarmati Special will depart Agra Cantt at 22.10 hrs w.e.f 27th Nov, 2020. The timings of arrival/departure at enroute stations on WR will be Palanpur (09.42/09.44) and Mahesana (10.28/10.30). The train will reach Sabarmati at 11.50 hrs.
7) Train No.01104/01103 Bandra Terminus – Jhansi Superfast Special (Bi-Weekly)
Train No.01104 Bandra (T) – Jhansi Special will depart from Bandra (T) at 05.10 hrs w.e.f 1st Dec, 2020. The timings of arrival/departure at enroute stations on WR will be Borivali (05.30/05.33), Vapi (07.12/07.14), Surat (08.32/08.37), Bharuch (09.18/09.20), Vadodara (10.24/10.34), Godhra Jn (11.55/11.57), Dahod (12.43/12.45) Ratlam (14.30/14.40), Nagda (15.43/15.45), Ujjain (16.55/17.10) and Maksi (18.00/18.02). The train will reach Jhansi at 05.00 hrs. Similarly, Train No.01103 Jhansi – Bandra (T) Special will depart Jhansi at 16.50 hrs w.e.f 29th Nov, 2020. The timings of arrival/departure at enroute stations on WR will be Maksi (3.05/3.07), Ujjain (03.55/04.10), Nagda (05.08/05.10), Ratlam (06.05/06.15), Dahod (07.39/07.41), Godhra (08.53/08.55), Vadodara (10.00/10.10), Bharuch (11.18/11.20), Surat (12.25/12.30), Vapi (13.38/13.40) and Borivali (15.14/15.17). The train will arrive Bandra (T) at 16.00 hrs.
8) Train No.04189/04190 Daund - Gwalior Superfast Special (Weekly)
Train No.04189 Daund - Gwalior Special will depart from Daund at 23.10 hrs w.e.f 29th Nov, 2020. The timings of arrival/departure at enroute stations on WR will be Vasai Rd (04.40/ 04.45), Boisar (05.21/0523), Vapi (06.11/ 06.13), Valsad (06.34/06.36), Surat (07.30/ 07.35), Bharuch (08.10/08.12), Vadodara (09.03/09.13) and Godhra (10.23/10.25). The train will reach at Gwalior at 01.10 hrs. Similarly, Train No.04190 Gwalior- Daund Special will depart Gwalior at 17.15 hrs w.ef 28th Nov, 2020. The timings of arrival/ departure at enroute stations on WR will be Godhra (06.21/06.23), Vadodara (07.15/07.25), Bharuch (08.11/08.13), Surat (09.37/09.42), Valsad (10.32/10.34), Vapi (10.54/10.56), Boisar (11.35/11.37) and Vasai Rd (12.25/12.30). The train will reach Daund at 18.20 hrs.
आगरा से गुजरने वाली कई ट्रेनों के समय में बदलाव की घोषणा हुई है। कुछ दिन पहले रेलवे ने अप की केरला एक्सप्रेस के समय में बदलाव की जानकारी दी थी। अब चार अन्य ट्रेनों के समय में बदलाव की जानकारी सामने आई है। समय में बदलाव नवंबर के अंत में अलग-अलग तारीखों से शुरू होगा। आगरा रेल मंडल के पीआरओ एसके श्रीवास्तव ने बताया कि गाड़ी संख्या 01841/01842 खजुराहो-कुरुक्षेत्र-खजुराहो के समय में बदलाव किया गया है। गाड़ी 28 नवंबर से खजुराहो से शाम 6.25 बजे चलकर रात 3.50 बजे आगरा कैंट पहुंचेगी। वापसी में ट्रेन कुरुक्षेत्र से दोपहर 3.10 बजे चलकर रात 9.30 बजे आगरा कैंट पहुंचेगी। समय में बदलाव के चलते ट्रेन दोनों तरफ से पुराने समय के हिसाब से करीब 50 मिनट पहले आगरा कैंट पहुंचेगी। इसी तरह ट्रेन संख्या 02247/02248 ग्वालियर-अहमदाबाद-ग्वालियर सुपरफास्ट एक्सप्रेस के समय में रेलवे ने 28 नवंबर से बदलाव किया है। अब ग्वालियर से...
more...
ट्रेन पुराने समय रात 8.05 बजे के बजाय पांच मिनट लेट 8.10 पर प्रस्थान करेगी। ट्रेन आगरा कैंट पर पुराने समय रात 10 बजे ही पहुंचेगी। वापसी में ट्रेन आगरा कैंट पर पहले के समय सुबह 8 बजे के स्थान पर 55 मिनट पहले 7.05 बजे आगरा कैंट पहुंचेगी। यह ट्रेन सप्ताह में तीन दिन ग्वालियर से चलती है।ट्रेन संख्या 02547/02548 आगरा कैंट-अहमदाबाद-आगरा कैंट सुपरफास्ट के समय में भी आंशिक बदलाव किया गया है। सप्ताह में तीन दिन चलने वाली ट्रेन अब आगरा कैंट से तो पुराने समय पर ही चलेगी। परंतु अहमदाबाद से वापसी में ट्रेन सुबह 8.20 के बजाय 55 मिनट पहले 7.05 बजे आगरा कैंट पहुंचेगी।
Oct 12 2020 (18:20) लेटलतीफी:नैरोगेज ट्रेन बंद करने का फैसला नहीं कर सकी सरकार, ब्रॉडगेज ट्रैक और पुल का काम शुरू नहीं (dainik-b.in)
Other News
NCR/North Central
0 Followers
25700 views

News Entry# 421153  Blog Entry# 4743675   
  Past Edits
Oct 12 2020 (18:21)
Station Tag: Rayaru/RRU added by Need stoppage of Singrauli Exp/1887927

Oct 12 2020 (18:21)
Station Tag: Gwalior Junction/GWL added by Need stoppage of Singrauli Exp/1887927

Oct 12 2020 (18:21)
Train Tag: Gwalior - Ahmedabad COVID - 19 SF Special/02247 added by Need stoppage of Singrauli Exp/1887927

Oct 12 2020 (18:21)
Train Tag: Ratlam - Gwalior COVID - 19 Special/01125 added by Need stoppage of Singrauli Exp/1887927

Oct 12 2020 (18:21)
Train Tag: Bundelkhand COVID - 19 Special/01107 added by Need stoppage of Singrauli Exp/1887927
Stations:  Gwalior Junction/GWL   Rayaru/RRU  
Posted by: aryan89~ 112 news posts
3000 करोड़ लागत के ब्रॉडगेज रेल प्रोजेक्ट का काम अब 2021 में शुरू हो पाएगा। पहला कारण है कि कच्चा ट्रैक बनाने के लिए रेलवे को अब तक जौरा, कैलारस व सबलगढ़ की निजी भूमि उपलब्ध नहीं हुई है। दूसरा, रेलवे बोर्ड व राज्य शासन ने अब तक नैराेगेज ट्रेन के संचालन को विधिवत बंद करने का संयुक्त निर्णय नहीं लिया है। दोनों ही कामों में विधानसभा उपचुनाव आड़े आ रहा है। रेलवे का कहना है कि 249 करोड़ और 184 करोड़ के टेंडरों काे वित्तीय स्वीकृति मिलने के बाद ठेकेदार को काम के लिए खुली जमीन चाहिए।
ब्रॉडगेज रेल प्रोजेक्ट के काम को आगे बढ़ाने के लिए रेलवे ने 249 करोड़ रुपए का टेंडर खोल दिया है। इस टेंडर पर काम
...
more...
करने वाले ठेकेदार को सुमावली से लेकर सबलगढ़ तक 50 छोटे पुलों का निर्माण करने के साथ ही 51 किमी लंबाई में मिट्‌टी का कच्चा ट्रैक बनाकर तैयार करना होगा जिस पर बड़ी लाइन बिछाने का काम शुरू होगा। रेलवे ने 184 करोड़ रुपए का दूसरा टेंडर भी ओपन कर लिया है। इसमें बिरला नगर से सबलगढ़ तक 10 बड़े पुलों का निर्माण कराया जाना प्रस्तावित है।
ब्रॉडगेज लाइन के लिए रेलवे बानमोर से सुमावली के बीच घोड़ा पछाड़ नदी पर, जौरा से कैलारस के बीच सोन नदी पर, कैलारस से सबलगढ़ के बीच क्वारी नदी व वीरपुर से श्योपुर के बीच सीप नदी पर चार बड़े पुलों का निर्माण कराएगी। अंडरग्राउंड सब-वे भी बनाए जाएंगे। पुलों के निर्माण का काम दो साल की समयसीमा में पूरा कराने की शर्त टेंडर में लगाई गई है। यहां बता दें कि रेलवे ने रायरू से सुमावली के बीच लगभग 27 किमी लंबाई में खुदाई व अर्थवर्क का काम गत नवंबर 2018 में 112 करोड़ रुपए का ठेका देकर शुरू कराया था लेकिन भूमि अधिग्रहण में देरी के कारण मड ट्रैक बनाने का काम अब तक पूरा नहीं हो सका।
जानिए...क्या है ब्रॉडगेज रेल प्रोजेक्ट3000 करोड़ रुपए की लागत से ग्वालियर से श्योपुर के बीच 187 किमी लंबा ब्रॉडगेज ट्रैक बिछाया जाना स्वीकृत है। गेज परिवर्तन का काम ग्वालियर के बिरलानगर स्टेशन से श्योपुर के बीच किया जाना प्रस्तावित है।नई रेल लाइन रायरू रेलवे स्टेशन से चार किलोमीटर आगे जाने के बाद बामौर गांव स्टेशन की तरफ मुड़ जाएगी। इस बीच में 30 मीटर चौड़े हाईवे के ऊपर से ओवरब्रिज बनाकर ट्रेन निकाली जाएगी। इस प्रोजेक्ट में ग्वालियर से श्योपुर के बीच नदी और नालों पर 223 पुलों का निर्माण किया जाएगा। इनमें से 42 बड़े पुल और 181 छोटे पुल-पुलिया बनाए जाएंगे। इसके अलावा 114 रेल क्रॉसिंग के नीचे और ऊपर ओवरब्रिज बनेंगे। इनमें से सात आरओबी बनेंगे।
नैरोगेज का संचालन बंद हो तब शुरू होगा नया कामरेलवे अधिकारियाें का कहना है कि ब्रॉडगेज रेल प्रोजेक्ट के लिए ठेकेदारों को अधिग्रहित जमीन चाहिए। साथ ही उन्हें नैरोगेज ट्रैक के अलाइनमेंट पर बड़ी लाइन के लिए ट्रैक तैयार करना है, इसलिए सबसे पहले नैरोगेज ट्रेन का संचालन बंद कराए जाने का निर्णय रेलवे समेत राज्य शासन को लेना है। 107 साल पुरानी नैरोगेज ट्रेन का संचालन बंद होने के बाद ठेकेदार पुराने ट्रैक को उखाड़कर उसके स्थान पर ब्रॉडगेज का नया ट्रैक तैयार करेगा। नैरोगेज ट्रेन संचालन के लिए राज्य शासन को रेलवे बोर्ड में हलफनामा देना होगा कि इस ट्रेन के संचालन को बंद करने से मुरैना जिले में किसी प्रकार की कोई कानून-व्यवस्था खराब नहीं होगी और लोगों के आवागमन के लिए पर्याप्त साधन उपलब्ध हैं तब रेलवे बोर्ड नैरोगेज पैसेंजर ट्रेन के संचालन को बंद करने की घोषणा करेगा।
चुनाव... जमीन अधिग्रहण का काम ठपजौरा, मुरैना, अंबाह, दिमनी व सुमावली विधानसभा के उपचुनाव में राजस्व अधिकारी-कर्मचारियों की ड्यूटी लगा देने से रेलवे के लिए किसानों की निजी जमीन के अधिग्रहण का काम आचार संहिता लागू होने के बाद बंद हो गया है। मतगणना के नतीजे आने व आचार संहिता समाप्त होने के बाद 20 नवंबर से जमीनों के अधिग्रहण की प्रक्रिया के फिर से शुरू होने की स्थिति बनेगी। जब तक जौरा में किसानों की जमीन रेलवे को उपलब्ध नहीं कराई जाएगी तब तक ठेकेदार ट्रैक तैयार करने का काम शुरू नहीं कर पाएंगे। रेलवे का कहना है कि उन्होंने जमीन अधिग्रहण के लिए राजस्व विभाग को अब तक 165 करोड़ रुपए दिया है लेकिन प्रशासन ने अभी तक 82 करोड़ रुपए जमीन अधिग्रहण के मामले में व्यय किए हैं। प्रशासन की मांग अभी 100 करोड़ की और है।



Page#    7 News Items  

Go to Full Mobile site