Large TB;
Entry# 2097954-0
no description available
Entry# 2176710-0


12347/Sahid Express
Other Names: Rampurhat Express
शहीद एक्सप्रेस

HWH/Howrah Junction --> RPH/Rampurhat Junction

Availability Calendar
Search HWH to RPH
Return# 12348
PDF Download
Latest News
(You need to double-check/verify this info yourself)
🔹12347 UP Howrah –Rampurhat Express will be controlled suitably for 25 minutes enroute o­n 20/04, 21/04, 23/04, 24/04, 25/04, 27/04, 28/04 and 30.04.2023.
Fri Apr 21, 2023 (04:54PM)
News History
Running with Extra Chair Car, DE1 placed before D1
Mon Mar 06, 2023 (11:48PM)
• JCO 31.01.2023 to 09.02.2023 will be cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER. • JCO 14.02.2023 to 20.02.2023 will remain cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Wed Feb
...
more...
08, 2023 (05:47PM)
• JCO 31.01.2023 to 09.02.2023 will remain cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Tue Jan 31, 2023 (01:47AM)
• JCO 31.01.2023 to 04.02.2023 will be cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Thu Jan 26, 2023 (09:01AM)
JCO 28.11.2022 to 02.12.2022 is cancelled due to Non - Interlocking work at Baruipara, Kamarkundu, and Chandanpur in Howrah - Barddhaman Chord section for commissioning of 4th line between Baruipara and Chandanpur.
Sat Nov 26, 2022 (09:02AM)
D6 To D10 Unreserved WEF 8/11/2021 ;
Tue Nov 09, 2021 (09:07PM)
0 Follows
Bedroll/Linen: NOT Available change
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
Updated: Nov 19 2023 (15:12) by Brahman^~
Dep:
Arr:
Rating: 3.6/5 (79 votes)
cleanliness - good (13)
punctuality - good (14)
food - average (12)
ticket avbl - good (14)
u/r coach - good (10)
railfanning - good (14)
safety - good (12)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
GEN
  5
GEN
  6
GEN
  7
DE1
  8
 D1
  9
 D2
 10
 D3
 11
 C1
 12
GEN
 13
GEN
 14
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    77 Pic/Video Blogs  <<prev  next>>

11448/Shktpnj Exprss BWN/Brddhmn
Train services disrupted due to signal failure,point failure,OHE failure & subsequent...
×

12347/Shd Exprss PNE/Prntk
150th Loco of Howrah ELS. First time Aswamedh in duty. Aswamedh...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

12347/Shd Exprss BHP/Blpr Shntnktn
Augmentation of coaches for "Poush Mela" at Bolpur click here ...
×

12344/Drjlng Ml RPH/Rmprht
Mega block.Please note (Source-ER/fb) ...
×

12347/Shd Exprss
Shahid Express with DLW made HWH P7 30552
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss HWH/Hwrh
×

12347/Shd Exprss HWH/Hwrh
HWH's shunter boy takes a short nap after shunting 12347 Shahid...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

11448/Shktpnj Exprss BWN/Brddhmn
Train services disrupted due to signal failure,point failure,OHE failure & subsequent...
×

12347/Shd Exprss PNE/Prntk
150th Loco of Howrah ELS. First time Aswamedh in duty. Aswamedh...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

12249/Hwrh Annd JOX/Jn
🔘NOTICE FOR ALL BLOCK (P.WAY,TRD,etc) OVER Howrah Barddhaman Chord HBC line...
×

12347/Shd Exprss DKAE/Dnkn
It is may be required to change "Triple-electrified line" To "Construction...
×

12347/Shd Exprss HWH/Hwrh
Temporary Augmentation click here ...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss HWH/Hwrh
×

12347/Shd Exprss HWH/Hwrh
HWH's shunter boy takes a short nap after shunting 12347 Shahid...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

11448/Shktpnj Exprss BWN/Brddhmn
Train services disrupted due to signal failure,point failure,OHE failure & subsequent...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

12249/Hwrh Annd JOX/Jn
🔘NOTICE FOR ALL BLOCK (P.WAY,TRD,etc) OVER Howrah Barddhaman Chord HBC line...
×

12347/Shd Exprss BLAE/Blrmbt
Howrah WAP-4 22412 cruises past Balarambati with In charge 12347 Shahid...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss HWH/Hwrh
RSA
×

12347/Shd Exprss
Captured at Rampurhat
×

12347/Shd Exprss GKH/Gskr
12347 Howrah - Rampurhat Shahid superfast express with ASN WAM-4 #21385...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

11448/Shktpnj Exprss BWN/Brddhmn
Train services disrupted due to signal failure,point failure,OHE failure & subsequent...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

12347/Shd Exprss HWH/Hwrh
Augmentation of coaches.
×

12347/Shd Exprss TIT/Tlt
Video link- click here12347 UP Howrah[HWH]- Rampurhat[RPH] Sahid SF Express with...
×

12347/Shd Exprss
Shahid with brand new HWH WAP7 30629
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss HWH/Hwrh
×

12347/Shd Exprss
TB of 12347 taken during my trip at hwh
×

12347/Shd Exprss BEQ/Blr
Video link- click hereFirst time on Youtube: Live Electric loco as...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×

12347/Shd Exprss
Asansol WAM 4 incharge of 12347 HWH RPH Sf Exp
×

12347/Shd Exprss PNE/Prntk
150th Loco of Howrah ELS. First time Aswamedh in duty. Aswamedh...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

12347/Shd Exprss HWH/Hwrh
🔶Visit of General Manager, Eastern Railway at Electric Loco Shed Bamungachi...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

53047/Vswbhrt Fst Pssngr LLHW/Llh Wrkshp
2nd UTKRISHT AC CHAIR CAR ; EASTERN RAILWAYThe AC Chair Car...
×

12347/Shd Exprss BHP/Blpr Shntnktn
Augmentation of coaches for "Poush Mela" at Bolpur click here ...
×

12347/Shd Exprss TIT/Tlt
Video link- click here12347 UP Howrah[HWH]- Rampurhat[RPH] Sahid SF Express with...
×

13173/Sldh Agrtl RPH/Rmprht
NOTICES of allEngineering/Freight Corridor block of 🔶 MALDA & HOWRAH DIVISION...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss SNT/Snth
RAILFANNING ON A RAINY DAY Some shots...
×

12347/Shd Exprss HWH/Hwrh
×

12347/Shd Exprss HWH/Hwrh
HWH's shunter boy takes a short nap after shunting 12347 Shahid...
×

12347/Shd Exprss BEQ/Blr
Video link- click hereFirst time on Youtube: Live Electric loco as...
×

12347/Shd Exprss BHP/Blpr Shntnktn
First time ever in SBG LoopShahid Exp with E loco for...
×
Go to Full Mobile site