Medium; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3097927-0
Medium; Side View; Small TB; 3 AC; Outside of Train; Standing at Station; Standing;
Entry# 3969365-0


15612⇒22512/Kamakhya - Mumbai LTT Karmabhoomi Express (PT)
कामाख्या - मुंबई लोकमान्य तिलक टर्मिनस कर्मभूमि एक्सप्रेस

KYQ/Kamakhya Junction --> LTT/Mumbai LTT

Availability Calendar
Search KYQ to LTT
Return# 22511
PDF Download
Latest News
(You need to double-check/verify this info yourself)
Journey commencing on 14/10/2023 will remain cancelled.
Thu Oct 05, 2023 (11:40PM)
News History
▪️ Departure from Kamakhya on 30.09.23 & 14.10.23 is cancelled
Thu Sep 28, 2023 (12:36AM)
▪️ Departure from Kamakhya on 12.08.23 is diverted via Asansol - Purulia - Tatanagar.
Wed Aug 09, 2023 (10:41PM)
JCO 03/06/2023 will remain cancelled.
Sat Jun 03, 2023 (07:15PM)
Cancelled on 08/04/23.
Fri Apr 07, 2023 (03:08PM)
• JCO 04.02.2023 will be diverted via - New Farakka, Azimganj, Katwa, Bandel, Howrah with stoppages at Azimganj, Katwa, Bandel & Howrah due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Tue Jan 31, 2023 (08:30AM)
▪️22512 Kamakhya-LTT Express JCO 12.11.2022, 19.11.2022, 26.11.2022, 3.12.2022, 10.12.2022 will be short terminated at Thane.▪️JCO on 12.11.22 is cancelled
Fri Nov 11, 2022 (02:03AM)
22512 Kamakhya-LTT Express JCO 12.11.2022, 19.11.2022, 26.11.2022, 3.12.2022, 10.12.2022 will be short terminated at Thane.
Wed Nov 09, 2022 (02:57PM)
▪️ Departure from Kamakhya on 24.09.22 is cancelled
Wed Sep 21, 2022 (11:12PM)
Due to Pre/Non Interlocking work at Kachewani station in connection with Raj Nandgaon-Kalumna 3rd line work of Nagpur division in South East Central Railway the following train services will be Cancelled. Train No. 22512 Kamakhya-Lokmanya Tilak (T) Karmabhoomi Express scheduled to leave on 03-09-2022 will remain cancelled.
Tue Aug 30, 2022 (08:35PM)
Due to Pre-Non Interlocking & Non Interlocking work for 4th line connectivity at Himgir station in Raigarh - Jharsuguda Jn. Section from 21-08-2022 to 29-08-2022, the following train services will be Cancelled. Train No 22512 Kamakhya - Lokmanya Tilak (T) Karmabhoomi Express scheduled to leave from Kamakhya on 20-08-2022 & 27-08-2022...
more...
will remain cancelled.
Thu Aug 18, 2022 (10:23PM)
Restoration of Unreserved Booking in this Train will start W.E.F 09/07/2022
Sat Jun 25, 2022 (05:21PM)
Journey Commencing on 21.05.2022 will be diverted via Durgapur-Asansol-Chandil-Sini-Chakradharpur.
Sun May 22, 2022 (02:31AM)
JCO 26.02.2022 will remain cancelled due to NI work in RNY division of NF railway for commissioning of double line.
Wed Feb 23, 2022 (03:35PM)
दिनांक 25.12.2021 को निरस्त रहेगी।
Thu Dec 23, 2021 (09:53AM)
-
Wed Dec 22, 2021 (08:11PM)
JCO 04.12.2021 fully cancelled
Fri Dec 03, 2021 (09:12AM)
Coach Composition ;- EOG – 02, PC – 01, GS (2S) – 03, SL – 10, 3AC – 05, 2AC – 01 = 22 LHB Coaches. 📢 Due to traffic and power block for 3 days on DN Howrah-Barddhaman Chord & Reverse line at Saktigarh station of ER, Train no. 02256...
more...
will be diverted via Bandel-Howrah-Kharagpur on 11.07.2021..
Thu Jul 08, 2021 (04:20AM)
3 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Dec 24, 2010
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
Updated: Jan 16 (14:44) by _V_K_^~
Dep:
Arr:
RSA - Rake Sharing
No RSA. Single Rake. CDO - KYQ.
Rating: 4.0/5 (47 votes)
cleanliness - good (8)
punctuality - good (8)
food - good (7)
ticket avbl - good (8)
u/r coach - good (7)
railfanning - excellent (8)
safety - good (8)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 A1
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 10
 PC
 11
 S1
 12
 S2
 13
 S3
 14
 S4
 15
 S5
 16
 S6
 17
 S7
 18
 S8
 19
 S9
 20
S10
 21
 GS
 22
EOG
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Kamakhya Junction/KYQ to Mumbai LTT/LTT

Distance: 2953 km    Unreserved General Fare:  523

Regular Ticket (12 and above)

SleeperAC 3-tierAC 2-tier
Base Fare85021433219
Catering Charges---
Reservation Charges204050
Superfast Charges304545
Other Charges---
Concession---
GST 5%-111166
Net Fare90023403480
Tatkal Surcharge~268~675~1014

Child Ticket (5 - 11)

SleeperAC 3-tierAC 2-tier
Base Fare85021433219
Catering Charges---
Reservation Charges---
Superfast Charges304545
Other Charges---
Concession-425-1072-1610
GST 5%-5683
Net Fare45511751740
Tatkal Surcharge~134~338~507


Regular Adult Fare for children 5 - 11 years IF FULL SEPARATE BERTH is required.

Children 0 - 5 years travel free. No separate berth provided.

Tatkal Surcharge extra for bookings in Tatkal Quota.

Sr. Citizen Concessions do not apply for Tatkal quota bookings.

Final Fare may be rounded up to the next 5 multiple.

Sr. Citizen Female (58 and above)

SleeperAC 3-tierAC 2-tier
Base Fare85021433219
Catering Charges---
Reservation Charges204050
Superfast Charges304545
Other Charges---
Concession-425-1072-1610
GST 5%-5885
Net Fare47512151790
Tatkal Surcharge~134~338~507

Sr. Citizen Male (60 and above)

SleeperAC 3-tierAC 2-tier
Base Fare85021433219
Catering Charges---
Reservation Charges204050
Superfast Charges304545
Other Charges---
Concession-340-857-1288
GST 5%-69101
Net Fare56014402130
Tatkal Surcharge~161~405~609
Go to Full Mobile site