Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

नहीं कोई गम, रेलवे से हैं हम - Aman

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sun Dec 5 09:34:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRAdvanced Search

NMKL/Namakkal (3 PFs)
நாமக்கல்     नामक्कल

Track: Single Electric-Line

Show ALL Trains
Bharathiar Nagar, Senthamangalam Road, Namakkal, 637001
State: Tamil Nadu

Elevation: 186 m above sea level
Zone: SR/Southern   Division: Salem

No Recent News for NMKL/Namakkal
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 33
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.8/5 (54 votes)
cleanliness - good (8)
porters/escalators - poor (5)
food - average (6)
transportation - average (7)
lodging - average (5)
railfanning - average (8)
sightseeing - average (7)
safety - good (8)
Show ALL Trains

Station News

Page#    Showing 1 to 14 of 14 News Items  
Jul 12 (19:13) Paddy loading takes off at Ariyalur railway good shed (www.thehindu.com)
SR/Southern
0 Followers
59216 views

News Entry# 458965  Blog Entry# 5012360   
  Past Edits
Jul 12 2021 (19:13)
Station Tag: Katpadi Junction/KPD added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Vriddhachalam Junction/VRI added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Namakkal/NMKL added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Dharmapuri/DPJ added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Hosur/HSRA added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Namakkal/NMKL added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Chettinad/CTND added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Royapuram/RPM added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Polur/PRL added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Cuddalore Port Junction/CUPJ added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Mayiladuturai Junction/MV added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Peralam Junction/PEM added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Kumbakonam/KMU added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Thiruvarur Junction/TVR added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Nagappattinam Junction/NGT added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Mannargudi/MQ added by Piyush Srivastava😏/2088639

Jul 12 2021 (19:13)
Station Tag: Ariyalur/ALU added by Piyush Srivastava😏/2088639
The railway goods shed at Ariyalur, where loading of cement in bulk quantities is done, saw paddy loading for the first time on Monday.
About 1,100 tonnes of paddy was loaded by Tamil Nadu Civil Supplies Corporation in 21 freight wagons for transportation to Hosur for hulling, said a senior railway official here.
The goods shed in Tiruchi division has been witnessing cement loading in large quantities over the years due to the presence of major cement units in the district. However, this is for the first time that paddy has been
...
more...
loaded from the goods shed for transportation by rail, said the official.
Usually, paddy and rice are loaded from various goods sheds in the fertile delta region, which falls under the Tiruchi division, and transported by rail to different destinations within the State.
Paddy is loaded at Mannargudi, Tiruvarur, Nagapattinam, Kumbakonam, Peralam, Mayiladuthurai and Cuddalore. It is sent for hulling at Polur, Royapuram in Chennai, Chettinad near Karaikudi, Namakkal, Hosur and Dharmapuri.
Rice is also transported from the delta region to places such as Namakkal, Vriddhachalam and Katpadi. Loading of paddy in Tiruchi division in the current fiscal up to June is 2.56 lakh tonnes, the official added.
Dec 25 2018 (19:25) யஷ்வந்த்புர் - #திருச்சி - யஷ்வந்த்புர் இடையே டிச 29ம் மற்றும் ஜன 13ம் தேதி பகல் நேர சிறப்பு ரயில். (tnrailfans.blogspot.com)
New/Special Trains
0 Followers
35762 views

News Entry# 372422  Blog Entry# 4153376   
  Past Edits
Dec 25 2018 (19:25)
Station Tag: Salem Junction/SA added by sGs*^~/41440

Dec 25 2018 (19:25)
Station Tag: Rasipuram/RASP added by sGs*^~/41440

Dec 25 2018 (19:25)
Station Tag: Namakkal/NMKL added by sGs*^~/41440

Dec 25 2018 (19:25)
Station Tag: Karur Junction/KRR added by sGs*^~/41440

Dec 25 2018 (19:25)
Station Tag: Tiruchchirappalli Junction/TPJ added by sGs*^~/41440

Dec 25 2018 (19:25)
Train Tag: Trichy - Yesvantpur Tatkal Fare Special/06538 added by sGs*^~/41440

Dec 25 2018 (19:25)
Train Tag: Yesvantpur - Trichy Tatkal Fare Special/06537 added by sGs*^~/41440

Dec 25 2018 (19:25)
Train Tag: Yesvantpur - Tiruchchirapalli Tatkal Fare Special/06535 added by sGs*^~/41440

Dec 25 2018 (19:25)
Train Tag: Tiruchchirapalli - Yesvantpur Tatkal Fare Special/06536 added by sGs*^~/41440
யஷ்வந்த்புர் - #திருச்சி - யஷ்வந்த்புர் இடையே டிச 29ம் மற்றும் ஜன 13ம் தேதி பகல் நேர சிறப்பு ரயில்.
📍கே.ஆர்.புரம், குப்பம், #சேலம், #ராசிபுரம், #நாமக்கல், #கரூர் வழியாக இயக்கம்.
🚊⬇ யஷ்வந்த்புர் - திருச்சி சிறப்பு ரயில்
யஷ்வந்த்புர் 5:00 காலை
சேலம்
...
more...
09:30 / 09:40 காலை
ராசிபுரம் 10:33 / 10:34
நாமக்கல் 10:59 / 11:00
கரூர் 11:40 / 11:42
திருச்சி 1:30 மதியம்
🚊⬇திருச்சி - யஷ்வந்த்புர் சிறப்பு ரயில்
திருச்சி 3:00 மாலை
கரூர் 4:30 / 4:42 மாலை
நாமக்கல் 4:55 / 4:57
ராசிபுரம் 5:18 / 5:20
சேலம் 5:40 / 5:45
யஷ்வந்த்புர் 10:45 இரவு
யஷ்வந்த்புர் - பெங்களுரில் இருக்கும் ரயில் நிலையம்.
Sep 04 2018 (07:48) Railways begin land survey for Ariyalur-Namakkal line’ Chettinad Cement to be evicted off Railway land (www.railnews.in)
New Facilities/Technology
SR/Southern
0 Followers
25620 views

News Entry# 355101  Blog Entry# 3776608   
  Past Edits
Sep 04 2018 (07:48)
Station Tag: Namakkal/NMKL added by a2z~/1674352

Sep 04 2018 (07:48)
Station Tag: Ariyalur/ALU added by a2z~/1674352
Stations:  Ariyalur/ALU   Namakkal/NMKL  
The construction wing of the SR has begun a land survey for laying a new broad gauge line for 108-km connecting Ariyalur  (on the Thiruchchirappalli Division of Southern Railway) with Namakkal (on the Salem Division of Southern Railway) via Perambalur, Thuraiyur and Thathaiyengarpet.
The proposed line is expected to provide connectivity for Perambalur district. In its recent order, the railway board has communicated to SR that Rs 16.5 lakh has been sanctioned to conduct the survey.
“We will be assessing the tentative route of the line along with the quantum of land required
...
more...
for the project. In addition, freight and passenger traffic potential, classification of land and rate of return for the project would also be studied,” said an official from the construction wing. Presently, with no direct train connectivity, the people of Perambalur district travel up to Tiruchy or Ariyalur to take trains.
The proposed new line will connect Perambalar and Namakkal districts with Chennai – Madurai chord line thereby creating an alternative route linking Namakkal with Chennai.“Presently, Chennai – Namakkal section gets connected via Katpadi, Jolarpet and Salem station. The proposed new line would provide connectivity between Chennai Egmore and Namakkal via Villupuram and Ariyalur. In addition, if the proposed route is extended up to Erode it will provide second rail route to Western Tamil Nadu,” said railway sources.
The Chennai Egmore – Madurai chord line and Chennai Central – Salem line are linked through various routes, including Arakkonam – Kancheepuram – Chengalpattu section, Katpadi – Vellore – Tiruvannamalai – Villupuram, Erode – Karur – Dindigul, Vriddhachalam -Attur – Salem, Tiruchy – Karur – Namakkal – Salem and Dindigul – Karur – Namakkal – Salem.
“Since Ariyalur has a number of cement factories, freight movement in the proposed new railway line will be heavy since cement is now transported by road to different places within Tamil Nadu and neighbouring States,” Mr. Marutharaja said.
Passenger movement will be equally good since the demand for rail service to Perambalur has remained a felt need for several years now, he felt.
The proposed survey is expected to begin in a couple of months.
According to railway sources, it will be done from engineering and traffic point of view. Land required for the new project, number of bridges to be constructed and the new stations en route will come under the scope of engineering survey. Tenders will be floated to identify an agency to carry out the survey.
The traffic survey will be done by the Southern Railway Construction Organisation, said the sources. It will take into account passenger, freight and parcel movements in the proposed new line and prospective returns for the railway.
Chettinad Cement Corp Ltd has been ordered to vacate government land that it encroached upon to construct a railway track to its Ariyalur railway track. The Madras High Court passed the judgement with Justice SM Subramaniam also ordering a probe into government officials involved in colluding with factory management to use the land.
“Such industries cannot encroach upon government land, which is not only a water body, but also used as a pathway by the villagers and the people of that locality. This, the collusion in this regard by the authorities  are also to be investigated by the state government, said Subramaniam.
The court dismissed Chettinad Cement’s plea for action against the sub-collector against the encroachment. Chettinad Cement has two weeks to evict all encroachments made by the company on the land.
Aug 23 2018 (07:33) Railways begin land survey for Ariyalur-Namakkal line (www.newindianexpress.com)
New Facilities/Technology
SR/Southern
0 Followers
25518 views

News Entry# 352566  Blog Entry# 3739555   
  Past Edits
Aug 23 2018 (07:33)
Station Tag: Namakkal/NMKL added by a2z~/1674352

Aug 23 2018 (07:33)
Station Tag: Ariyalur/ALU added by a2z~/1674352
Stations:  Ariyalur/ALU   Namakkal/NMKL  
CHENNAI: The construction wing of the SR has begun a land survey for laying a new broad gauge line for 108-km connecting Ariyalur with Namakkal, via Perambalur, Thuraiyur and Thathaiyengarpet.The proposed line is expected to provide connectivity for Perambalur district. In its recent order, the railway board has communicated to SR that Rs 16.5 lakh has been sanctioned to conduct the survey.
“We will be assessing the tentative route of the line along with the quantum of land required for the project. In addition, freight and passenger traffic potential, classification of land and rate of return for the project would also be studied,” said an official from the construction wing. Presently, with no direct train connectivity, the people of Perambalur district travel
...
more...
up to Tiruchy or Ariyalur to take trains.
The proposed new line will connect Perambalar and Namakkal districts with Chennai - Madurai chord line thereby creating an alternative route linking Namakkal with Chennai.“Presently, Chennai - Namakkal section gets connected via Katpadi, Jolarpet and Salem station. The proposed new line would provide connectivity between Chennai Egmore and Namakkal via Villupuram and Ariyalur. In addition, if the proposed route is extended up to Erode it will provide second rail route to Western Tamil Nadu,” said railway sources.
The Chennai Egmore - Madurai chord line and Chennai Central - Salem line are linked through various routes, including Arakkonam - Kancheepuram - Chengalpattu section, Katpadi - Vellore - Tiruvannamalai - Villupuram, Erode - Karur - Dindigul, Vriddhachalam -Attur - Salem, Tiruchy - Karur - Namakkal - Salem and Dindigul - Karur - Namakkal - Salem.
Aug 18 2018 (15:24) Nod for survey on Ariyalur-Namakkal BG line project (www.thehindu.com)
New Facilities/Technology
SR/Southern
0 Followers
17983 views

News Entry# 351570  Blog Entry# 3725224   
  Past Edits
Aug 18 2018 (15:24)
Station Tag: Namakkal/NMKL added by a2z~/1674352

Aug 18 2018 (15:24)
Station Tag: Ariyalur/ALU added by a2z~/1674352
Stations:  Ariyalur/ALU   Namakkal/NMKL  
The Ministry of Railways has accorded sanction to a survey for a new broad gauge line from Ariyalur to Namakkal via Perambalur, Thuraiyur and Thathaiyengarpet.
The proposed new railway line, running to a distance of 108 km, has brightened the prospects of rail service to backward Perambalur district, which lacks train connectivity at present.
The Railway Board had recently communicated to Southern Railway General Manager and Southern Railway Construction Organisation regarding the sanction for the survey for the proposed new line at a cost of Rs. 16.20 lakh.
Thuraiyur
...
more...
and Thathaiyengarpet are two important towns falling under the limits of Tiruchi district.
The Southern Railway Construction Organisation, which carries out a slew of gauge conversion projects in the Southern Railway Zone, will conduct the survey.
“The Railway Ministry’s sanction to carry out the survey for the new line is a positive development,” said Perambalur Lok Sabha MP R.P. Marutharajaa.
The entire Perambalur district lacks rail connectivity at present. And the demand for bringing Perambalur under the scope of railway network has been a long standing one, he pointed out.
The Perambalur MP recalled that he met former Railway Ministers Sadananda Gowda and Suresh Prabhu and handed over separate memorandums to them appealing for rail connectivity to Perambalur. A memorandum containing the demand was also given to the President.
The proposed survey is expected to begin in a couple of months.
According to railway sources, it will be done from engineering and traffic point of view. Land required for the new project, number of bridges to be constructed and the new stations en route will come under the scope of engineering survey. Tenders will be floated to identify an agency to carry out the survey.
The traffic survey will be done by the Southern Railway Construction Organisation, said the sources. It will take into account passenger, freight and parcel movements in the proposed new line and prospective returns for the railway.
The results of the survey will be sent to the Railway Board for perusal, a senior official said.
“Since Ariyalur has a number of cement factories, freight movement in the proposed new railway line will be heavy since cement is now transported by road to different places within Tamil Nadu and neighbouring States,” Mr. Marutharaja said.
Passenger movement will be equally good since the demand for rail service to Perambalur has remained a felt need for several years now, he felt.
The Railway Ministry’s sanction to carry out the survey for the new line is a positive development
R.P. Marutharajaa,Perambalur MP
Page#    Showing 1 to 14 of 14 News Items  

Go to Full Mobile site