Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

Gatimaan Express: Raftaar meri Pehchaan - Sajid Akhtar

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Mon Jul 4 01:42:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 545803-0

MZX/Matatila (3 PFs)
ماتاٹيلا     माताटीला

Track: Double Electric-Line

Show ALL Trains
District- Lalitpur
State: Uttar Pradesh

Elevation: 299 m above sea level
Zone: NCR/North Central   Division: Virangana Lakshmibai (Jhansi)

No Recent News for MZX/Matatila
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.1/5 (7 votes)
cleanliness - average (1)
porters/escalators - n/a (0)
food - poor (1)
transportation - poor (1)
lodging - poor (1)
railfanning - good (1)
sightseeing - good (1)
safety - poor (1)
Show ALL Trains

Station News

Page#    Showing 1 to 4 of 4 News Items  
Mar 25 2021 (19:25) Gwalior Railway News: ओएचई लाइन टूटी, ट्रेने घंटो हुई लेट, यात्री हुए परेशान (www.naidunia.com)
Major Accidents/Disruptions
NCR/North Central
0 Followers
48601 views

News Entry# 446949  Blog Entry# 4919128   
  Past Edits
Mar 25 2021 (21:02)
Station Tag: Jhansi Junction/JHS added by अमन गुप्ता امان گپتا/999833

Mar 25 2021 (19:25)
Station Tag: Gwalior Junction/GWL added by Adittyaa Sharma/1421836

Mar 25 2021 (19:25)
Station Tag: Bina Junction/BINA added by Adittyaa Sharma/1421836

Mar 25 2021 (19:25)
Station Tag: Lalitpur Junction/LAR added by Adittyaa Sharma/1421836

Mar 25 2021 (19:25)
Station Tag: Vidisha/BHS added by Adittyaa Sharma/1421836

Mar 25 2021 (19:25)
Station Tag: Talbahat/TBT added by Adittyaa Sharma/1421836

Mar 25 2021 (19:25)
Station Tag: Matatila/MZX added by Adittyaa Sharma/1421836
Gwalior Railway News: ग्वालियर.नईदुनिया प्रतिनिधि। बीती रात झांसी रेल सेक्शन के जद में आने वाले माताटीला-तालबेट के बीच डाउन ट्रैक की ओएचई लाइन टूटने से डाउन ट्रैक पर ट्रेनों की आवाजाही तीन घंटे तक बंद रही जिसके कारण भोपाल के रास्ते रात को ग्वालियर आने वाली ट्रेनें अल सुबह ग्वालियर पहुंची। इस वजह इन ट्रेनों से सफर करने वाले यात्रियों को प्लेटफार्म के सर्कुलेटिंग एरिया में रतजगा करना पड़ा।
बीती रात झांसी सेक्शन में पड़ने वाले माताटीला तालबेट के बीच ओएचई लाइन अचानक टूट गई। जिससे ओएचई लाइन के तार डाउन ट्रेक की पटरियों पर आ गिरा। आएचई लाइन के टूटने की जानकारी मिलते ही पूरे रेल सेक्सन पर बिजली आपूर्ति बंद कर दी गई। ओएचई लाइन टूटने के कारण इस रेल
...
more...
खण्ड पर तीन घंटे तक डाउन ट्रैक पर ट्रेनों की आवाजाही पूरी तरह से बाधित रही। हालांकि एक घंटे बाद अप ट्रैक पर ट्रेनों की आवाजाही शुरू कर दी गई थी, लेकिन अप ट्रैक से केवल झांसी से भोपाल जाने वाली ट्रेनों को ही निकाला गया वहीं भोपाल से आने वाली ट्रेनों को विदिशा, बीना व ललितपुर स्टेशनों पर रोके रखा गया ।

ये ट्रेनें आई घंटों लेट: ओएचई लाइन टूटने के कारण रात के आने वाली एमपी संपर्क क्रांति पांच घंटे, तमिलनाडू एक्सप्रेस तीन घंटे, कर्नाटका व सचखण्ड ढाई घंटे , खजुराहो- कुरुक्षेेत्र एक्सप्रेस दो घंटे सहित श्रीधाम-केरला व मंगला भी देरी से ग्वालियर पहुंची।
मुसाफिर को करना पड़ा रतजगा:
कोविड के नियम से ट्रेन से सफर करने वाले मुसाफिरों को रतजगा करना पड़ा। रेलवे द्वारा तय की गाई गाइड लाइन के अनुसार प्लेटफार्म पर मुसाफिरों को एंट्री ट्रेन आने के नब्बे मिनट पहले दी जाती है। ऐसे में घंटो ट्रेनांे के लेट होने से मुसाफिरों को प्लेटफार्म पर एट्री नहीं देने के कारण यात्रियों को सर्कुलेटिंग एरिया में बैठकर ही ट्रेनों का इंतजार करना पड़ा।
Aug 24 2016 (17:02) Cabinet approves construction of third line between Jhansi and Bina (pib.nic.in)
0 Followers
116117 views

News Entry# 278052  Blog Entry# 1971528   
  Past Edits
Aug 24 2016 (6:06PM)
Station Tag: Agasod Junction/AGD added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Bina Junction/BINA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Mohasa/MXS added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Lalitpur Junction/LAR added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Dailwara/DWA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Matatila/MZX added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Talbahat/TBT added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Basai/BZY added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Burhpura/BPW added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Babina/BAB added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Jhansi Junction/JHS added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246
Ministry of Railways24-August, 2016 16:14 IST
Cabinet approves construction of third line between Jhansi and Bina
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has given its approval for construction of third line between Jhansi and Bina at an estimated cost of Rs.2001.63 crore and expected completion cost of Rs.2,273.84 crore.
The 152.57 km long railway
...
more...
line is expected to be completed in four years.
Besides facilitating the travel, goods trains passing through this section will get adequate capacity for smooth running. Jhansi and Lalitpur districts of Uttar Pradesh and Sagar district (Bina) of Madhya Pradesh will be covered by this line.
Background:
Jhansi-Bina section is a BG double line on New Delhi-Mumbai CST route. This project will enhance capacity, reduce detention and cater for future growth of traffic. At present, number of passenger and goods train in this section are far more than its capacity, resulting in heavy detention to trains.
*****
AKT/VBA/SH
(Release ID :149177)

Jul 21 2016 (20:40) बीना से झांसी रेलवे स्टेशन तक बनेगी तीसरी रेल लाइन (www.amarujala.com)
Commentary/Human Interest
NCR/North Central
0 Followers
63923 views

News Entry# 274431  Blog Entry# 1936814   
  Past Edits
Jul 22 2016 (8:25PM)
Station Tag: Mandi Bamora/MABA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Matatila/MZX added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Talbahat/TBT added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Babina/BAB added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Basai/BZY added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Bina Junction/BINA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Lalitpur Junction/LAR added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 21 2016 (8:40PM)
Station Tag: Jhansi Junction/JHS added by Saurabh*^~/15807

Jul 21 2016 (8:40PM)
Station Tag: Bina Junction/BINA added by Saurabh*^~/15807
ललितपुर। बीना-झांसी रेलखंड पर यातायात लगातार बढ़ने से हो रही दिक्कत को देखते हुए बीना से झांसी रेलवे स्टेशन के मध्य रेलवे द्वारा तीसरी रेल लाइन बनाने का निर्णय लिया गया है। तीसरी रेल लाइन के निर्माण के लिए 2001.90 करोड़ रुपये बजट को मंजूरी मिल गई है और रेलवे अधिकारियों द्वारा कागजी कार्रवाई शुरू कर दी गई है।
ललितपुर रेलवे स्टेशन पर रोजाना पैसेंजर और मालगाड़ी ट्रेन मिलाकर करीब दो सौ ट्रेनों का संचालन होता है। इसके साथ ही अब टीकमगढ़ से खजुराहो रेलवे स्टेशन तक ट्रेनों का संचालन शुरू होने पर ट्रेनों का ट्रैफिक और भी अधिक बढ़ जाऐगा। इसके चलते रेलवे द्वारा बीना से झांसी रेलवे स्टेशन तक रेलवे द्वारा सुचारु व सुगम रेल संचालन के लिए तीसरी रेल
...
more...
लाइन बनाए जाने का निर्णय लिया है। इसके लिए रेलवे द्वारा कागजी स्तर पर कार्य शुरू कर दिया गया है। लाइन के निर्माण के लिए जमीन का अधिग्रहण संबंधी काम की प्रक्रिया रेलवे ने शुरू कर दी है। बीना से झांसी के मध्य 20 रेलवे स्टेशन आऐंगे, ऐसे में बीना से झांसी तक 152.57 किलोमीटर लंबाई की तीसरी रेल लाइन का निर्माण के दौरान रेल लाइन पर 152 छोटे पुलों का निर्माण भी किया जाना है। इस लाइन के निर्माण में 2001.90 करोड़ रुपए लागत की योजना तैयार की गई है, जो पांच वर्ष में पूरा किए जाने का प्रस्ताव है।
तीसरी रेल लाइन के निर्माण के लिए रेलवे द्वारा योजना संबंधी कार्य शुरू कर दिया गया है। तीसरी रेल लाइन का निर्माण कार्य के तहत तीसरी लाइन निर्माण के लिए सर्वे कार्य और जमीन अधिग्रहण संबंधी प्रक्रिया शुरू कर दी गई है। लाइन के निर्माण कार्य शुरू होने में समय लगेगा।
- गिरीश कंचन, पीआरओ, रेलवे, झांसी।

1 Public Posts - Thu Jul 21, 2016





Nov 14 2013 (13:08) रेल मंडल के छह स्टेशनों की बढ़ेगी लंबाई (www.amarujala.com)
New Facilities/Technology
NCR/North Central

News Entry# 156565   
  Past Edits
Nov 14 2013 (7:43PM)
Station Tag: Manikpur Junction/MKP added by moderator**/12

Nov 14 2013 (7:43PM)
Station Tag: Banda Junction/BNDA added by moderator**/12

Nov 14 2013 (7:43PM)
Station Tag: Matatila/MZX added by moderator**/12

Nov 14 2013 (7:43PM)
Station Tag: Burhpura/BPW added by moderator**/12

Nov 14 2013 (7:43PM)
Station Tag: Sikroda/SKU added by moderator**/12

Nov 14 2013 (7:43PM)
Station Tag: Sikroda Kwanri/SIKD added by moderator**/12

Nov 14 2013 (1:08PM)
Station Tag: Jhansi Junction/JHS added by Bundelkhand/442974
Posted by: AB 233 news posts
गुरुवार, 14 नवंबर 2013
JhansiUpdated @ 5:44 AM IST
झांसी। रेल पटरियों पर बढ़ते ट्रैफिक को देखते हुए आने वाले साल में दो मालगाड़ियों को एक साथ जोड़कर चलाए जाने की योजना के मद्देनजर रेल मंडल के छह स्टेशनों की लंबाई बढ़ाकर पंद्रह सौ मीटर की जा रही है। इससे रास्ते में मेल व एक्सप्रेस गाड़ियों को आगे गुजारने में दिक्कत नहीं होगी।
रेल
...
more...
मंडल में प्रतिदिन दो सौ से अधिक सवारी, पैसेंजर व एक सौ पच्चीस मालगाड़ियों का संचालन होता है। सबसे अधिक ट्रैफिक आगरा- भोपाल मेन लाइन पर है। इस लाइन पर हर पांच मिनट में सवारी या मालगाड़ी दौड़ती है। समय के साथ गाड़ियों में की संख्या में इजाफा होता जा रहा है। अतिरिक्त पटरी का इंतजाम न होने के कारण रेल प्रशासन ने आने वाले समय में खाली दो मालगाड़ियों को जोड़कर गंतव्य तक पहुंचाने की योजना तैयार की है। विगत माह बीना रेल खंड में चले कार्य के दौरान दो मालगाड़ियों को झांसी से चलाकर सफल प्रयोग किया गया था। वर्तमान में सवारी गाड़ी को आगे निकालने के लिए मालगाड़ी को लूप लाइन में खड़ा करना पड़ता है। एक मालगाड़ी की लंबाई के हिसाब से 685 मीटर से 700 मीटर तक की लूप लाइन बनाई गई है। दो मालगाड़ियों को एक साथ खड़ी करने के लिए पंद्रह सौ मीटर लाइन की आवश्यकता पड़ेगी। इसे ध्यान में रखकर अब रेल प्रशासन मंडल के छह स्टेशनों पर पंद्रह सौ मीटर की लूप लाइन बनाने की तैयारी कर रहा है। इन स्टेशनों के नाम सिकरौंदा व आंतरी (झांसी व आगरा के मध्य) तथा बुढ़पुरा व माताटीला (झांसी व बीना के मध्य) के अलावा बांदा- कानपुर सेक्शन तथा मानिकपुर -नैनी सेक्शन में एक- एक स्टेशन की लंबाई बढ़ाई जा रही है।
जनसंपर्क अधिकारी रवि प्रकाश ने बताया कि जल्द ही इस योजना पर काम शुरू होने वाला है।
Page#    Showing 1 to 4 of 4 News Items  

Go to Full Mobile site