Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Gallery Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode
 
Thu Mar 28 19:19:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Medium; Platform Pic; Large Station Board;
Office
Entry# 2372219-0
Medium; Platform Pic; Large Station Board;
Entry# 2864810-1


VNA/Varangaon (3 PFs)
वरनगांव
वरणगांव


Track: Double Electric-Line

Updated: Mar 02 (20:06)
Show ALL Trains
National Highway 6, Varangaon
State: Maharashtra

Elevation: n/a
Type: Regular   Category: NSG-6
Zone: CR/Central   Division: Bhusaval


No Recent News for VNA/Varangaon
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.7/5 (8 votes)
cleanliness - average (1)
porters/escalators - poor (1)
food - average (1)
transportation - good (1)
lodging - poor (1)
railfanning - excellent (1)
sightseeing - average (1)
safety - average (1)
Show ALL Trains

Picture & Video Gallery

Page#    Showing 1 to 25 of 36 Pic/Video Blogs  next>>

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

BSL/Bhsvl
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is...
×

22111/Bhsvl Ngpr VNA/Vrngn
Varangaon Railway Station
×

VNA/Vrngn
Ludhiana's Tiger face standing at Varangaon station with BCNA wagons. Onboard...
×

VNA/Vrngn
#SB
×

12870/Hwrh Mmb VNA/Vrngn
Date : 16/01/16 (Saturday)
×

22137/Prrn Exprss BSL/Bhsvl
Fresh New BSL WAP-4 #22831 Hauled with Ahmedabad Bound Prerna Express...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

BSL/Bhsvl
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is...
×

18029/Mmb LTT  BSL/Bhsvl
Early Morning Scene! 18029 cruising out of BSL towards AK also,...
×

VNA/Vrngn
Ludhiana's Tiger face standing at Varangaon station with BCNA wagons. Onboard...
×

20926/Amrvt Srt VNA/Vrngn
A click from Surat Amravati Fast Passenger of sunset witnessed at...
×

12406/Hzrt Nzmddn  VNA/Vrngn
BSL WAP4 #22848 Powered Gondwana Express at Varangaon
×

22137/Prrn Exprss VNA/Vrngn
11454 Prerna Express with BSL WAM-4 #overtakes #offlink BSL WAM-4 12406...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

BSL/Bhsvl
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is...
×

12406/Hzrt Nzmddn  BD/Bdnr Amrvt
Journey Badnera to Bhusawal :12406 Nizamuddin-Bhusawal Gondwana SF Express power is...
×

VNA/Vrngn
Ludhiana's Tiger face standing at Varangaon station with BCNA wagons. Onboard...
×

VNA/Vrngn
As the Achalpur - Murtizapur - Yavatmal and Pulgaon - Arvi...
×

12406/Hzrt Nzmddn  VNA/Vrngn
Old BSL WAG5 A Rest at Varanagaon Station
×

22137/Prrn Exprss VNA/Vrngn
11454 Prerna Express with BSL WAM-4 #overtakes #offlink BSL WAM-4 12406...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

BSL/Bhsvl
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is...
×

VNA/Vrngn
Ludhiana's Tiger face standing at Varangaon station with BCNA wagons. Onboard...
×

12261/Mmb CSMT  VNA/Vrngn
22117 Pune Amravati AC Express overtaken by 12261 Mumbai Howrah Duronto...
×

NGP/Ngpr
Please rate this trainImaginary trains 29027 and 29028 BHUSAVAL NAGPUR BHUSAVAL...
×

22846/Ht Pn VNA/Vrngn
BSL WAP4 Hatia Pune SF Express #overtakes Gondwana SF Express
×

VNA/Vrngn
Twins TATA WAG-7 #27529 & #27535 Coal Freight passes through Varangaon....
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

1 km from @VNA   3m late@VNA: Varangaon &29 km/h Leaving -...
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   1m early@VNA: Varangaon &29 km/h Taking Loop Line Entering Arriving 30 Kmph 👍
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA   39m late@VNA: Varangaon &28 km/h Taking Loop Line 30 Kmph ✅
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

@VNA 1 km 7 km @BSCN   1h 14m late@VNA: Varangaon...
×

VNA/Vrngn
LGD WAG-9/HC equipped with Crew Voice & Video Recording System
×

BSL/Bhsvl
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is...
×

VNA/Vrngn
Ludhiana's Tiger face standing at Varangaon station with BCNA wagons. Onboard...
×

VNA/Vrngn
#SB
×

IMG29028-538661/♥♥Ngpr Bhswl Intrcty SF NGP/Ngpr
Please rate this trainImaginary trains 29027 and 29028 Bhusaval Nagpur Bhusaval...
×

12406/Hzrt Nzmddn  VNA/Vrngn
Identify train loco train no. And station
×
Go to Full Mobile site